![T&C TC42 Скачать руководство пользователя страница 7](http://html2.mh-extra.com/html/tandc/tc42/tc42_installation-and-operating-instructions-manual_3071016007.webp)
Minimum
rate screw
7.
With a 7/16” wrench loosen the pilot head
on the pilot assembly by a half-turn
(Fig.
#16)
8
Slide the pilot adjustment band over and
ensure that the hole in the orifi ce band is
showing. (Fig. #17 shows NG position,
Fig. # 18 shows LP position)
10.
Remove access panel to access control
assembly. (Fig. #18a)
10.
Remove the minimum rate screw located
in the valve.
(Fig.
#19)
Fig. #18
Fig. # 19
Fig. # 16
Fig. # 17
7
TC42.NG01.C 281009-12
Minimum
rate screw
Fig #20
11.
Replace the minimum rate screw with the
one provided in the propane conversion
kit supplied with this fi replace. Ensure
that the screw is fully installed.
(Fig.
#20)
Fig #18a