![Tanda TX7140 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/tanda/tx7140/tx7140_installation-and-operation-manual_3477817005.webp)
TX7140 Intelligent Manual Call Point
Installation &Operation Manual
4050100269-Rev1.1-1215
TANDA UK
Specifications are subject to change without prior notice
5
2 Installation
2.1 Installation Preparation
This manual call point must be installed, commissioned and maintained by a qualified or factory
trained service personnel. The installation must be installed in compliance with all local codes having
a jurisdiction in your area or BS 5839 Part 1 and EN54.
2.2 Installation and Wiring
1.
Mount the call point standard base on standard one gang electrical back box. Follow the
arrow mark for the correct position. Do not over-tighten the screws otherwise the base will
twist. Use two M4 standard screws.
2.
Connect the wire in terminal as shown in Figure two [2]. Verify the device number using
handheld programmer then stick on the label before attaching call point. The sticker labels
are available on the control panel.
3.
Align the call point and tabs and gently pushing the call point until it locks into place.
Terminal Description
Z1 Signal In (+)
Z1 Signal Out (+)
Z2 Signal In (-)
Z2 Signal Out (-)
Figure 2
Figure 1