![TANBead Maelstrom 4800 LH Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/tanbead/maelstrom-4800-lh/maelstrom-4800-lh_user-manual_3463436011.webp)
10
3. Installation
1.
Controller and extraction platform are to be connected by 25-pin power
cable and 25-pin signal line connectors.
2.
Connect electrical inlet of controller to an electrical outlet.
4. Get started
Turn on the main power switch (located on the back of controller) to the (on)
position. Once Maelstrom 4800LH is switched on, the instrument will perform a
self-test and calibration. After booting, you will see a menu showing the list of
programs in the controller:
The following example operation procedure will help you understand:
Select the
The Display of the Controller
Содержание Maelstrom 4800 LH
Страница 1: ...TANBead Nucleic Acid Extractor Non Sterile Maelstrom 4800 LH User Manual...
Страница 7: ...6 Equipment list No Item 1 Power cord 2 A plate of spin tips 3 Magnetic separator 4 User Manual...
Страница 9: ...8 Side view of extraction platform Shield plate...
Страница 10: ...9 Regulators of the sensors for detecting falling spin tip Control panel Buttons on control panel...
Страница 12: ...11 Set the Temperature UV LAMP Confirm the Selected Program Mount the Spin Tips...
Страница 13: ...12 Eject the Spin Tips STATUS RUNNING STATUS PAUSE STATUS PAUSE STATUS END...
Страница 17: ...16 NOTE 1 NOTE 2 Definition of plate number...
Страница 22: ...21 6 2 Communication between M4800 LH and Liquid Handling System...
Страница 23: ...22 6 4 Communication CRC Cyclical Redundancy Check...