background image

Installation Manual

 

Horizontal 

Pole Mount

 

 

 

 
 

 

Foundation Hole Guidelines 

The suggestions below are recommendations only. It is the installer’s responsibility to validate  foundation 

parameters prior to installation, as local geotechnical report may be required to assess  ground conditions. We 

recommend consulting with a local engineer familiar with local regulations and  build site requirements, 

including soil conditions, terrain and load criteria (wind, snow, seismic). All of  these parameters may impact 

foundation requirements. 

 

Foundation Hole Guidelines 

Nominal Pipe Size 6” Schedule 40, 6’ Above Grade 

Module Area 

Max Wind Speed 

Min. Hole 

Diameter 

Min. Hole Depth 

Min. Pole Depth 

70 

90MPH 

24” 

60” 

54” 

80 

90MPH 

24” 

66” 

60” 

90 

90MPH 

24” 

74” 

68” 

110 

90MPH 

24” 

82” 

76” 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Содержание UNI-PGRM 2019 Series

Страница 1: ...Horizontal Pole Mount Installation Manual UNI PGRM 2019 Edition V3 1 For models UNI PGRM 01 UNI PGRM 02 UNI PGRM 03 UNI PGRM 04 UNI PGRM 05 UNI PGRM 06 ...

Страница 2: ... the Horizontal Pole Mount can support installations in a wide range of locations Customer Support Tamarack Solar makes every effort to ensure your m ounting kit is easy to install If you need assistance at any point in your installation or have suggestions on how we can improve your experience call customer support at 1 800 819 7236 or email us at sales tamaracksolar com Tools Required Tools that...

Страница 3: ... 3102 000 Washer flat 5 16 SS 4 6 25 2501 015 Nut flange 5 16 SST 4 7 23 0100 033 GALV STEEL U BOLT 3 8 16 x 1 25 THRD LENGTH FOR 3 PIPE 5 OD LENGTH 1 8 25 3702 GLV Washer Flat HDG 2 9 25 3701 GLV WASHER LOCK 3 8 SPRING HDG 2 10 24 3716 GLV Nut Hex 3 8 16 HDG 2 ITEM PART NUMBER DESCRIPTION QTY 1 70 0400 000 rev C Cap 4 Pipe 1 2 23 0350 GLV GALV STEEL U BOLT 1 2 13 3 PIPE 2 3 51 0812 UBC rev A U BO...

Страница 4: ...es Assembly Step2 Install Top caps main beam to posts A Place Top Caps onto the posts don t tighten screws at this time B Place U Bolt clamps over the mounting holes on the top caps see next page C Place the main beam pipe onto the U Bolt clamps centered over the slots on each end of the top caps D Place 1 2 U bolts over the main beam pipe through the U Bolt clamps and top caps loosely attach with...

Страница 5: ...own below at one end B Place a level on the clamp to hold a horizontal position at this time Final angle adjustment will be done later C Tighten the nuts enough to hold the horizontal position as you will be placing modules onto them in next steps D Install the first mid clamp base 1 4 farther apart than the module width tighten to hold level to install the first module ...

Страница 6: ...e module and re tighten to hold position H Attach under module clamps to the module and end clamp base with the 5 16 18 x 7 8 bolt flange nut and washer as shown torque to 12ft Lbs NOTE The bolt must be up against the module frame I Install the next mid clamp base 1 4 wider than the module width tighten to hold position J Place next module onto the mid clamp base and center the module to overhang ...

Страница 7: ...e is ready then add the last end clamp base 1 4 wider than the module width place the module onto the clamps center the module move end clamp base up against the module attach last mid clamp top and under module clamps as done in previous steps Step 4 Set final angle A Loosen all the U Bolt nuts on the end and mid clamps just enough to allow the entire array to be rotated to the desired angle to t...

Страница 8: ...Installation Manual Horizontal Pole Mount 7 ...

Страница 9: ...heric conditions are excluded The Finish Warranty is VOID if the practices specified by AAMA 609 610 02 Cleaning and Maintenance for Architecturally Finished Aluminum www aamanet org are not followed by Purchaser for Tamarack Solar s aluminum based products The warranty covers the replacement cost of parts to repair the product to proper working condition Transportation and incidental costs associ...

Страница 10: ...und conditions We recommend consulting with a local engineer familiar with local regulations and build site requirements including soil conditions terrain and load criteria wind snow seismic All of these parameters may impact foundation requirements Foundation Hole Guidelines Nominal Pipe Size 6 Schedule 40 6 Above Grade Module Area Max Wind Speed Min Hole Diameter Min Hole Depth Min Pole Depth 70...

Отзывы: