![Tamarack Industries Thawzall HEATZONE TCH250 Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/tamarack-industries/thawzall-heatzone-tch250/thawzall-heatzone-tch250_operators-manual_815705022.webp)
10. If the unit starts without alarms, ensure the “Tridicator” gauge (temp+ pressure) located at the boiler,
(driver side) shall display the unit operating pressure between 5 and 10 PSI .
11. If the unit displays a LOW LEVEL alarm, follow the “fill up” instructions located at the boiler when
accessing the unit from the driver’s side service door, then reset the low level switch (located right
above the boiler (driver side).
12. Inspect the unit for leaks. (tanks, hoses, boiler, and manifolds). Repeat same inspection after one hour
(or once the unit is at temperature).
Shut-Down Procedure
1. At the control, HEATER CONTROL module turn the MAIN POWER switch to the
OFF position.
2. The unit will automatically start a "cool down" run taking the unit to 130ºF (54ºC) to
securely stop the boiler preventing it from a "hot stop". The unit will then automatically
shut down the heating loop.
3. Place the foot pedal on the ground, in a safe location close to the unit, to proceed coiling
the hoses back into the unit's drum.
4. Reel in all hoses, ensuring an even distribution of the hoses in the drum to keep the unit’s
weight as even and centered as possible. Engage the reel lock pin.
5. Turn all the switches to the OFF position, and close all ball valves in the glycol manifolds,
and fuel supply for a safe restart.
21
Содержание Thawzall HEATZONE TCH250
Страница 1: ...Operators Manual Part T90099 Date Sept 2019 TCH250 ...
Страница 16: ...Controls 15 ...
Страница 31: ...22 30 ...
Страница 48: ...47 Complete Drawer Assembly Removed Nozzle and Electrodes Removed ...