![Talon TP-40BA Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/talon/tp-40ba/tp-40ba_manual_3419577028.webp)
TP-40BA (Rev 1.0)
- 25 -
TALON TECH CO. LTD.
TP-40BA Pump Operation Sequence consists of Degas Pump and Dispense Pump.
7-1 Degas Pump
7-1-1 Degas Pump Role
Degas Pump has two functions roughly.
1. Take away bubbles made by PR before dispense.
When PR fills up in the buffer tank, bubbles go up and PR goes down. So, PR can be dispensed
without bubbles through the buffer tank (bubble trap).
2. Even though PR Bottle gets empty, about 30cc of PR still remains inside the buffer tank,
which prevents the process error to some extent.
3. Degas Pump Exterior
Pump Operation Sequence
7
Содержание TP-40BA
Страница 11: ...TP 40BA Rev 1 0 8 TALON TECH CO LTD 4 1 Track I O Signal Timing Chart Wiring Signal Interface 4...
Страница 26: ...TP 40BA Rev 1 0 23 TALON TECH CO LTD 6 3 Touch Pad Menu Tree...
Страница 35: ...TP 40BA Rev 1 0 32 TALON TECH CO LTD 9 2 Pump Dimensions 9 2 1 Front View 9 2 2 Side View...
Страница 36: ...TP 40BA Rev 1 0 33 TALON TECH CO LTD 9 3 Touch Pad Dimensions 9 3 1 Front View 9 3 2 Rear View 9 3 3 Side View...
Страница 37: ...TP 40BA Rev 1 0 34 TALON TECH CO LTD 9 4 Touch Pad Connection Board Dimensions 9 4 1 Top View...