STEP 3
Position the Cord into the Node base
at the desired points for your layout.
Slide the Insulation Tubes into the centre
of the Ceiling Nodes.
Screw the Node cap onto the Node base
clockwise until secure. Do not over tighten.
STEP 2
Attach Node base to ceiling. Always choose
screws and plugs that are appropriate for the
ceiling material.
Ensure the Node channel runs parallel with the
planned cord direction.
D1
D1
D2
A
C
D1
D1
C
D2
A
Dimmer to pendant 4m
Plug to dimmer 2m
Layout 1
Layout 2
STEP 1
Decide on your layout for the Plug-in pendant,
some examples are shown below.
Ensure you have enough cable for your desired
layout before setting up the pendant, and the
dimmer is always accessible