TAKTL
®
Field Guide | Drilling for Concealed Fasteners
Doc. P10-1 Rev. 1708
WWW.TAKTL-LLC.COM | 412.486.1600 | info
@
taktl-llc.com
TAKTL
®
Field Guide | Drilling for Concealed Fasteners | 2 of 8
B
02 Preparing the Drill
Lubricate the slide rails with Tri
Flow lubricating oil and drill bit
attachment areas with litihium
grease as shown. Parts should be
lubricated every two hours when
using the drilling machine and at
the start of each work day.
(FIG. B)
A
01 Securing the Panel
Lay the panel face down on the
clean foam sheeting provided in the
shipping crate. Prep a clean secondary
table for washing and drying panels
after drilling. Set up staging rack for
completed panels.
(FIG. A)
C
03 Calibration
To set the desired hole depth, locate
the depth adjustment bolt.
(FIG. C)
Wet drilling is required to reduce heat build up, sustain drill bit
life, and produce clean holes with the least amount of chatter.
Remember to maintain all TAKTL handling instructions while
staging, moving, thoroughly drying, and storing panels.
IMPORTANT
Before Drilling