3-11
OPERATION
Warm-up in cold climates
1. Perform the normal warm-up procedure.
2. Set the bucket cylinder at the stroke end
and keep it there.
Do not keep this condition for more than
30 seconds.
3. Repeat Step 2 until the bucket operating
speed becomes normal.
INSPECTION AFTER WARM-UP
After warming up the engine and machine
(hydraulic oil), perform the checks and
inspections described below, and repair if
necessary.
OPERATING THE MACHINE
1. Check that the warning lamps and meters
are as follows:
· Are all warning lamps off?
· Is the indicator on water temperature
gauge seen within the green range?
2. Check that there are no irregularities in the
exhaust color, sound and vibrations.
3. Raise the safety bar to the locked position,
and then check that the control levers are
locked.
Содержание TL8
Страница 1: ......
Страница 7: ...0 5...
Страница 12: ...0 10...
Страница 13: ...1 1 SAFETY...
Страница 55: ...1 43 SAFETY SAFETY SIGNS DECALS With Lift arm lower button TL10 TL12...
Страница 56: ...1 44 SAFETY SAFETY SIGNS DECALS...
Страница 57: ...1 45 SAFETY SAFETY SIGNS DECALS...
Страница 58: ...1 46 SAFETY SAFETY SIGNS DECALS...
Страница 59: ...2 1 CONTROLS...
Страница 113: ...3 1 OPERATION...
Страница 119: ...3 7 MEMO...
Страница 143: ...4 1 TRANSPORT...
Страница 148: ...4 6...
Страница 149: ...5 1 MAINTENANCE...
Страница 211: ...6 1 TROUBLESHOOTING...
Страница 234: ...6 24...
Страница 235: ...7 1 SPECIFICATIONS...
Страница 239: ...7 5 MEMO...
Страница 240: ...7 6 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Страница 243: ...7 9 MEMO...
Страница 244: ...7 10 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Страница 246: ...7 12...
Страница 247: ...8 1 OPTIONS...
Страница 261: ...8 15...