170
OPTIONS
3-Holes Bucket
The digging capacity increases when the
bucket’s link arm installation position is
switched from (A) to (B). However, this
shortens the bucket stroke.
• Struck capacity (SAE):
0.075 m
3
(0.098 cu. yd.)
• Rated capacity (SAE):
0.093 m
3
(0.121 cu. yd.)
Changing the Link Arm
Installation Position
Refer to page 131 “Replacing the Bucket” in
the manual.
OL1L170
A
B
OL1L180
Содержание TB28FR
Страница 6: ...4...
Страница 8: ...6...
Страница 36: ...34...
Страница 91: ...89 TRANSPORT Loading and Unloading 90 Securing the Machine 91 Cautions on Transporting 92...
Страница 151: ...149 Main Specifications 150 Machine Dimensions 152 Operating Range 154 Lifting Capacities 157 SPECIFICATIONS...
Страница 153: ...151 MEMO...
Страница 154: ...152 SPECIFICATIONS Machine Dimensions J1K001 N L M D Q P J H K C F G A S E B R T U...
Страница 156: ...154 SPECIFICATIONS Operating Range J1K002 D J H K C F G A E B...
Страница 158: ...156 MEMO...
Страница 162: ...160...
Страница 167: ...165 OPTIONS Safety Signs Decals 1 No 03593 32200 2 No 03593 32300...
Страница 168: ...166 MEMO...
Страница 173: ...171 MEMO...
Страница 174: ...172...
Страница 175: ...173 INDEX...