3-9
OPERATION
5. Travel slowly forward and in reverse
several times.
Warm-up in cold climates
1. Perform the normal warm-up procedure.
OPERATING THE MACHINE
2. Set the bucket cylinder at the stroke end
and keep it there.
Do not keep this condition for more than
30 seconds.
3. Repeat Step 2 until the bucket operating
speed becomes normal.
INSPECTION AFTER WARM-UP
After warming up the engine and machine
(hydraulic oil), perform the checks and
inspections described below, and repair if
necessary.
1. Check that the warning lamps and meters
are as follows:
· Are all warning lamps off?
· Is the LED on water temperature gauge
seen within the green range?
2. Check that there are no irregularities in the
exhaust color, sound and vibrations.
3. Raise the safety lock lever to the locked
position, and then check that the
operating and travel levers are locked.
Содержание TB215R
Страница 10: ...0 8 ...
Страница 11: ...1 1 SAFETY SAFETY ...
Страница 44: ...1 34 SAFETY SAFETY SIGNS DECALS ...
Страница 45: ...1 35 SAFETY SAFETY SIGNS DECALS No 00085 01011 ...
Страница 46: ...1 36 SAFETY SAFETY SIGNS DECALS ...
Страница 47: ...1 37 SAFETY SAFETY SIGNS DECALS ...
Страница 48: ...1 38 ...
Страница 49: ...2 1 CONTROLS ...
Страница 77: ...3 1 OPERATION ...
Страница 107: ...4 1 TRANSPORT ...
Страница 112: ...4 6 ...
Страница 113: ...5 1 MAINTENANCE ...
Страница 149: ...5 37 MEMO ...
Страница 169: ...6 1 TROUBLESHOOTING ...
Страница 183: ...7 1 SPECIFICATIONS ...
Страница 185: ...7 3 MEMO ...
Страница 186: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS ...
Страница 188: ...7 6 SPECIFICATIONS OPERATING RANGES ...
Страница 190: ...7 8 MEMO ...
Страница 192: ...7 10 SPECIFICATIONS LIFTING CAPACITIES ...
Страница 193: ...7 11 SPECIFICATIONS LIFTING CAPACITIES ...
Страница 194: ...7 12 ...
Страница 195: ...8 1 OPTIONS ...
Страница 203: ...8 9 ...