5-27
MAINTENANCE
EVERY 50 HOURS
(A) Rubber crawler
59 to 64 mm (2.3 to 2.5 in.)
Adjustment
Increasing the tension
1. Remove the cover (1).
2. Inject grease through the grease fitting (3)
of the grease discharge valve (2) with a
grease gun.
3. Inspect the crawler tension.
Decreasing the tension
1. Remove the cover (1).
2. Slowly loosen (one turn) the grease
discharge valve (2) with a spanner to
discharge grease. If grease does not
come out well, move the machine back-
and-forth.
3. Tighten the grease discharge valve (2).
· Tightening torque: 177 N·m (130 ft-lb.)
Содержание TB215R
Страница 10: ...0 8 ...
Страница 11: ...1 1 SAFETY SAFETY ...
Страница 44: ...1 34 SAFETY SAFETY SIGNS DECALS ...
Страница 45: ...1 35 SAFETY SAFETY SIGNS DECALS No 00085 01011 ...
Страница 46: ...1 36 SAFETY SAFETY SIGNS DECALS ...
Страница 47: ...1 37 SAFETY SAFETY SIGNS DECALS ...
Страница 48: ...1 38 ...
Страница 49: ...2 1 CONTROLS ...
Страница 77: ...3 1 OPERATION ...
Страница 107: ...4 1 TRANSPORT ...
Страница 112: ...4 6 ...
Страница 113: ...5 1 MAINTENANCE ...
Страница 149: ...5 37 MEMO ...
Страница 169: ...6 1 TROUBLESHOOTING ...
Страница 183: ...7 1 SPECIFICATIONS ...
Страница 185: ...7 3 MEMO ...
Страница 186: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS ...
Страница 188: ...7 6 SPECIFICATIONS OPERATING RANGES ...
Страница 190: ...7 8 MEMO ...
Страница 192: ...7 10 SPECIFICATIONS LIFTING CAPACITIES ...
Страница 193: ...7 11 SPECIFICATIONS LIFTING CAPACITIES ...
Страница 194: ...7 12 ...
Страница 195: ...8 1 OPTIONS ...
Страница 203: ...8 9 ...