![Takeuchi TB125 Скачать руководство пользователя страница 220](http://html1.mh-extra.com/html/takeuchi/tb125/tb125_operators-manual_3338419220.webp)
218
OPTIONS
3-Hole Bucket
The digging capacity increases when the
bucket’s link arm installation position is
switched from (A) to (B). However, this
shortens the bucket stroke.
• Struck capacity (SAE):
TB125: 0.075 m
3
(0.098 cu. yd.)
TB135: 0.100 m
3
(0.130 cu. yd.)
TB145: 0.149 m
3
(0.195 cu. yd.)
• Rated capacity (SAE):
TB125: 0.093 m
3
(0.121 cu. yd.)
TB135: 0.130 m
3
(0.170 cu. yd.)
TB145: 0.188 m
3
(0.246 cu. yd.)
Changing the Link Arm
Installation Position
Refer to page 128 “Replacing the Bucket” in
the manual.
OL1L170
A
B
OL1L180
Содержание TB125
Страница 6: ...4 ...
Страница 8: ...6 ...
Страница 89: ...87 TRANSPORT Loading and Unloading 88 Securing the Machine 89 Cautions on Transporting 90 ...
Страница 148: ...146 ...
Страница 149: ...147 SPECIFICATIONS Main Specifications 148 Machine Dimensions 152 Operating Range 158 Lifting Capacities 165 ...
Страница 153: ...151 MEMO ...
Страница 166: ...164 MEMO ...
Страница 194: ...192 ...
Страница 205: ...203 MEMO ...
Страница 253: ...251 MEMO ...
Страница 258: ...256 ...
Страница 259: ...257 INDEX ...