![Takeuchi TB125 Скачать руководство пользователя страница 100](http://html1.mh-extra.com/html/takeuchi/tb125/tb125_operators-manual_3338419100.webp)
98
MAINTENANCE
Important Parts
For safe use, the machine must be serviced periodically. To increase safety, periodically
replace the parts listed in the following table of important parts.
Serious injury or a fire could result if they deteriorate or are damaged.
Table of Important Parts
Above important parts are vulnerable to aging and wear or deterioration and it is difficult to
determine the degree to which they have deteriorated on the occasion of periodic service. To
maintain their proper function at all times, therefore, replace them with new ones after using
them for a specific period of time even if no abnormality is found with the parts. If you find
abnormalities in these parts before their scheduled replacement time is reached, repair or
replace them immediately. If a hose clamp is deformed or cracked, replace it immediately.
When replacing the important parts, please contact a Takeuchi sales or service outlet .
Also check the hydraulic hoses other than the above important parts. If any abnormality is
found in them, retighten them or replace them immediately.
When replacing the hydraulic hoses, replace the O-rings and seals at the same time.
Check the fuel and hydraulic hoses according to the periodic schedule described below.
Refer to “Maintenance”.
Type of inspection
Inspection item
Daily inspection
Leakages from joints, hydraulic or fuel hoses.
Monthly inspection Leakages from joints, hydraulic or fuel hoses.
Damaged hydraulic or fuel hoses(cracks, wear and tear).
Annual inspection Leakages from joints, hydraulic or fuel hoses.
Deteriorated, twisted, damaged hydraulic or fuel hoses (cracks, wear
and tear) or hoses in contact with other parts of the machine.
Unit
Important parts to be replaced periodically
Replacement Interval
Fuel hoses
Packing in fuel filler cap
Engine oil filter hoses
Heater hoses
Air conditioner hoses
Hydraulic hoses ( Pump - delivery )
Hydraulic hoses ( Pump - suction )
Hydraulic hoses ( Slew motor )
Hydraulic hoses ( Travel motor )
Hydraulic hoses ( Boom cylinder lines )
Hydraulic hoses ( Second boom cylinder lines )
Hydraulic hoses ( Arm cylinder lines)
Hydraulic hoses ( Bucket cylinder lines )
Hydraulic hoses ( Swing cylinder )
Hydraulic hoses ( Blade cylinder )
Hydraulic hoses ( Tension cylinder )
Hydraulic hoses ( Pilot valve )
Hydraulic hoses ( Auxiliary lines )
Seat belt
Working
equipment
Engine connection
Machine
body
Every 2 years
Every 3 years
Hydraulic
system
Fuel system
Heater & AC systems
Содержание TB125
Страница 6: ...4 ...
Страница 8: ...6 ...
Страница 89: ...87 TRANSPORT Loading and Unloading 88 Securing the Machine 89 Cautions on Transporting 90 ...
Страница 148: ...146 ...
Страница 149: ...147 SPECIFICATIONS Main Specifications 148 Machine Dimensions 152 Operating Range 158 Lifting Capacities 165 ...
Страница 153: ...151 MEMO ...
Страница 166: ...164 MEMO ...
Страница 194: ...192 ...
Страница 205: ...203 MEMO ...
Страница 253: ...251 MEMO ...
Страница 258: ...256 ...
Страница 259: ...257 INDEX ...