background image

COPY

‑ 3 ‑

Apr./28/ 06

Adjust the setting to meet the 

motorcycle in a safe place with

utmost care.

Put a inlet pipe gasket between the

cylinder head and the inlet pipe, and

tighten the inlet pipe with 6x20 and

6x50 socket cap screws.

Specified torque

      

:10 N

m (1.0 kgf

m)

Fasten the insulator to the inlet pipe

with two socket cap screws.

Specified torque

      

:10 N

m (1.0 kgf

m)

Detaching the top cover from the 

carburetor of the kit, pull out the 

spring and throttle valve. Pass the

inner cable of the throttle cable 

  

through top cover and then put in 

the spring. And attach the inner cable

to the throttle valve, compressing the

spring. Then align the notch on the

throttle valve with the throttle

stopper screw, which please attach

to the carburetor.

Put the carburetor into the insulator,

and fasten it with a clamp band.

Insert a fuel tube and fasten it with

a tube clip. Open the fuel cock and

ckeck for oil leaks. (Do not leave

the cock open over a prolonged

period of time.)

Pull a choke lever to start the

engine. Gradually loosen your grip

on the lever back, and warm up

the engine till the revolution

becomes smooth. And then return

the lever fully back into its original

location. If the engine does not run

idle after warming-up, or it runs

idle at high revolutions, adjust the

revolutions with the throttle stop

screw.

Installation Procedures

Unfasten the inlet-pipe-tightening

bolt and air-cleaner-mounting 

bolts. Remove a throttle valve from

a carburetor. Then remove the 

carburetor with the air cleaner box

and the inlet pipe and all.

Be careful not to let any foreign

substance into the intake port.

Confirming that the fuel cock is 

shut off, open a drain cock on the

carburetor to drain gasoline from

the float chamber onto an oil

container.

Before installation, check the kit
contents.

Unfasten the pan screws on the

throttle housing and remove the

throttle housing.

Remove the throttle valve from the

carburetor, and separate the 

throttle valve from the throttle 

cable. Then pull out the top cover

from the throttle cable.

Hold the earth cable to the frame

with an air-cleaner-mounting bolt.

Attach an air filter, and hold it by 

tightening a band.

Adjust the free play at the throttle

grip to be about 5 mm by turning the

adjuster of the throttle cables.

Snap the throttle a few times to make

sure that the throttle moves smoothly

and that the throttle valve is fully 

open. Also check that the throttle has

free play even when the steering 

handle is turned all the way to the 

right and left.

In case of installation to any models

of Gorilla, replace the preinstalled 

fuel cock with the kit's cock. Adjust

the direction of the fuel cock and 

fasten the nut to the fuel tank.

      

Specified torque

  

:5

6 N

m (0.5

0.6 kgf

m)

Dispose of the blow-by gas from

the crankcase by yourself. In 

some cases, racing and

regulations stipulate the disposal

of the blow-by gas.)

In case of returning the blow-by

gas to the carburetor,

 

return the

blow-by gas to the union of the 

air filter.

(Installation)

Run a throttle cable of the kit under

the frame.

Pass the throttle cable of the kit 

through the lower throttle housing,

and connect the inner cable to the

throttle pipe. Fasten the throttle

housing to the handle  with two 

screws.

Apply grease to the rubbing

surface and cable end of the throttle

pipe, and cable-widing portion on the

pipe.

Specified torque

      

:5 N

m (0.5 kgf

m)

In the case of the Gorilla and

Monkey BAJA, remove a seat, 

drain gasoline in the fuel tank, shut

the fuel cock, pull out the fuel hose

on the carburetor side, and then

remove the fuel tank.

(Preparation for  

Installation

)

Caution: Make sure that engine 

     

and muffler are cool and

     

that the motorcycle is

     

secure!!

           

  

Caution: Be sure to tighten to the 

     

specified torque with a 

     

torque wrench!!

Inlet pipe

Insulator

Inlet pipe gasket

Adjuster

More free play

Less free play

About 5mm

3-5-16  Nishikiorihigashi   Tondabayashi   Osaka   Japan

TEL : 81-721-25-1357

FAX : 81-721-24-5059

URL : http://www.takegawa.co.jp

Co.,Ltd.

Отзывы: