Practice in Standing Postur
e
】
【
Practice in Sitting Posture
】
Distance from the end of the base to the wall surface or furniture:
【
Practice in Standing Postur
e
】
【
Practice in Sitting Posture
】
【
COMFOR
T/AXIS/LITE
】
660㎜
or over
【
PRIMO
】
700㎜
or over
(
including an aisle of 500 mm
(from handrail to wall surface)
)
201
256
40
45
45
185
272
136
243
191
36
8
400
251
149
Drainage Center
Product Center
【
Procedures for Installing the Pipe Gasket
】
RS1
NRS
W
ater Supply
(
1/2”13m/m
)
Hot W
ater Supply
(
1/2”13m/m
)
Drainage
(
VU40/VP40
)
110㎜
110㎜
80㎜
90㎜
90㎜
90㎜
★
★
<
Rise Dimen
sions of Pipe
>
●
Use waterproof flooring materials.
●
If the floor has an opening, cover the opening when completing the interior finishing (waterproofing).
●
Install all pipe gaskets.
180
100
37.5
Drainage
VU40
(
VP40
)
(
Rise: 100
㎜
)
Hot W
ater Supply
1/2” 13m/m
(
Rise: 60
㎜
)
W
ater Supply
1/2” 13m/m
(
Rise: 60
㎜
)
- W
ooden floor: V
eneer board with 30 mm thickness or more
- Mortar floor: Mortar thickness of 50 mm or more - Special floor (stone, etc.):
The base for which the
above-stated strength is ensured should be formed in the installation area.
:
Show the floor installation surface.
2~5㎜
Pipe Gasket (Sponge Side)
Make a cut.
※
Install the pipe
gasket.
※
Be sure to caulk
the pipe.
An aisle
(500
㎜
or over
)
The wall surface or furniture
the wall surface or furniture
Unit fixing position and Plumbing Layout
26
(1) Set the dedicated paper template on the floor by aligning it with the rise points for the water
, hot water
, and drainage pipes.
(2) Mark the bolt anchor position of the basin main unit. (3) Drill holes at the bolt anchor position of the basin main unit. (4) Remove the paper template.
A flexible pipe of L
= 200 mm is supplied with the product.
The work to change the pipe from RS1/NRS is possible without changing the rise point for the pipes.
Changing the pipe form RS1/NRS
When changing the pipe from NRS, the height of the riser drainage pipe must be adjusted to 1
10 mm.
Floor Surface of
Tile or Glass Finish
The tiles or glass of the floor surface will break when the bolts are embedded during installation of the shampoo unit. If this is the case, the installation area should be finished with materials such as plywood or mortar
.
(1) Peel of
f the inner tiles or glass along the outside
lines of the installation area of the floor
. The work
must be done carefully; otherwise, the peeled portion may be obvious. (2) Place composite panels in the peeled-of
f area.
The panel surface should be higher than the
surrounding tile or glass surface (within 2 or 3 mm).
Request measures to prevent water leakage under the floor and downstairs
Be sure to take the necessary precautions to prepare for and prevent possible water leaks.
(1) Make a cut in the pipe gasket at the pipe riser point.
(2) Peel of
f the adhesive sheet on the pipe gasket and set the gasket on the floor
.
(3) Cut the gasket in a circle at the cut portion on the gasket along with the pipe, and then caulk the area around the pipe.
Back End of Basin
Exterior Line of Cover
Bolt
Anchor Point
Bolt
Anchor Point
Bolt
Anchor Point
Chair Side
The floor surface requires the following strength:
Distance from the end of the base side
(aisle side) to the wall surface or furniture:
Bolt
Anchor Point
Bolt
Anchor Point
End of Base Side
Area of Floor Cutout 100 x 180
Caution for
Anchor Bolt Installation
Anchor bolts should be installed so that the screws will protrude from the bolt head by 3 to 5 mm. If the protrusion exceeds 5 mm, the bolt head may interfere with the cover
.
Exterior Line of Cover
Distance from the end of the basin to the wall surface or furniture :
600㎜
or over
630㎜
or over
Base End Position
Basin Side
859㎜
or over
889㎜
or over
Bolt
Anchor Point
Avoid the anchor positions when installing the pipe risers.
Caution
[ Unit : mm]