
94
Installation
TB9300 Installation and Operation Manual
© Tait Limited
March 2016
5.6.4
Connecting the Auxiliary DC Power Output
The PMU can provide an auxiliary DC output from the auxiliary power
supply board. This board is available with an output of 13.65VDC,
27.3VDC, or 54.6VDC (depending on the model), and is current limited to
3A, 1.5A or 750mA respectively. This power supply is permanently on as
soon as the base station has finished powering up, and is available on the
auxiliary output connector on the rear panel.
You can connect multiple auxiliary power supply boards in parallel for
redundancy purposes, or to provide an output greater than 40W. Although
no active current sharing is used, auxiliary boards connected in parallel will
current-share before reaching their power limit. The failure (or switching
off) of one auxiliary board will not load any other paralleled auxiliary
boards in the circuit.
The auxiliary power supply turns off briefly when the PMU restarts
after a firmware upgrade. This interruption may also cause any ancillary
equipment powered from the auxiliary supply to restart. If this is a prob-
lem for your system, we recommend connecting auxiliary power supply
boards in parallel to ensure an uninterrupted power supply for the ancil-
lary equipment.
Auxiliary DC Power
Output Cabling
Network elements are supplied with a connector, as shown in
Figure 5.10
.
You can use this to connect the PMU’s auxiliary DC power output to
another device (refer to
“PMU Auxiliary DC Output” on page 117
for the
pin allocations).
Contact your regional Tait office for details on the full range of wiring kits
available.
Figure 5.10 Auxiliary DC power connector
Phoenix MVSTBR2.5HC/2-ST/5.08 female
Содержание TB9300
Страница 1: ...TB9300 Base Station Repeater Installation and Operation Manual MBC 00008 12 Issue 12 March 2016...
Страница 10: ...10 Preface TB9300 Installation and Operation Manual Tait Limited March 2016...
Страница 32: ...32 Description TB9300 Installation and Operation Manual Tait Limited March 2016...
Страница 76: ...76 Installation TB9300 Installation and Operation Manual Tait Limited March 2016...
Страница 102: ...102 Troubleshooting TB9300 Installation and Operation Manual Tait Limited March 2016...
Страница 116: ...116 Replacing Modules TB9300 Installation and Operation Manual Tait Limited March 2016...
Страница 118: ...118 Appendix A Interface Pin Allocations TB9300 Installation and Operation Manual Tait Limited March 2016...
Страница 122: ...122 Appendix B Inter Module Connections TB9300 Installation and Operation Manual Tait Limited March 2016...
Страница 138: ...138 TB9300 Installation and Operation Manual Tait Limited March 2016...