TB7100 Installation Guide
Installation
11
© Tait Electronics Limited May 2005
1.8.3
Cabling
General
We recommend that you try to route all cables to and from the TB7100 base
station along the side of the cabinet so the cooling airflow is not restricted.
DC Power Cabling
DC power cables should be well supported so that the terminals on the base
station and on the ends of the cables do not have to support the full weight
of the cables.
The
Figure 1.4 on page 12
shows two recommended methods of securing
these cables to prevent straining either set of terminals.