S
handong Taishan Sports Equipment Co., Ltd
Web: www.taishansports.cn
Installation
Packing List
1-skirt
5-flexible
layer
2 pcs
1 pc
2-landing area
3-performance
area layout
4-run-up area
layout
1 unit
1 pc
1 pc
6-bracket Ⅰ
7-bracket Ⅱ
8-bracket Ⅲ
9-bracket Ⅳ
10-bracket Ⅴ
1 pc
19 pcs
1 pc
9 pcs
1 pc
11-plug 15
12-rods unit
13-slop bracket
14-run-up bracket
15-rubber
mat
5 pcs(spare)
20 pcs
1 pc
10 pcs
5 pcs(spare)
16-flat washer 10
17- flat washer 12
18-lock nut
19-lock nut
20-hex bolt
21-hex bolt
89 pcs
(spare 5pcs)
165 pcs
(spare 5pcs)
M10
M12
M12×75
M10×45
89 pcs
(spare5pcs)
165 pcs
(spare 5pcs)
165 pcs
(spare 5pcs)
89 pcs
(spare 5pcs)
3