background image

WARNING AND OPERATING INSTRUCTIONS

FOR ON RUBBER LIFTING CAPACITIES

NOTES FOR ON-RUBBER LIFTING CAPACITIES

1. Rated lifting capacities on rubber based on crane stability are 

according to ISO 4305.

2. Rated lifting capacities shown in the chart are based on 

condition that crane is set on firm level surfaces with 
suspension-lock applied. They are based on actual load 
radius increased by tire deformation and boom deflection.

3. If the suspension-lock cylinders contain air,the axle will not be 

locked completely and rated lifting capacities may not be 
obtainable. Bleed the cylinders according to the operation 
safety and maintenance manual.

4. Rated lifting capacities are based on proper tire inflation, 

capacity and condition. Damaged tires are hazardous to safe 
operation of crane.

5. Tires shall be inflated to correct air pressure.

6. Over front operation shall be performed within 2 degrees in 

front of chassis.When boom is out of 2 degrees in front of 
chassis, 360°capacities are effective.

7. On-rubber lifting with ”jib” is not permitted. Maximum 

permissible boom length is 31.9 m.

8. When making lift on-rubber stationary, set parking brake.
9. For creep operation, travel slowly and keep the lifted load as 

close to the ground as possible, and especially avoid any 
abrupt steering, accelerating or braking.

10. Do not operate the crane while carrying the load.
11. Creep is motion for crane not to travel more than 60 m in any 

30 minute period and to travel at the speed of less than 1.6 
km/h.

12. For creep operation, choose the drive mode and proper gear 

according to the road or working condition. 

Tires

29.5–25 36PR
29.5–25 40PR

Air Pressure

470 kPa
465 kPa

SPEC.  SHEET NO.  GR-1000E-4-00101/EX-01

-15-

SMART COUNTERWEIGHT

You can increase the capacity by changing the mounting position of the counterweight.

SMART CW 1 status

SMART CW 2 status

• 

SMART

 CW 1: Counterweight is mounted at the front.

• 

SMART

 CW 2: Counterweight is mounted at the rear.

4,190 mm

4,790 mm

Содержание GR-1000EX-4

Страница 1: ...mm approx 3 315 mm approx 3 805 mm 4 wheel steer 2 wheel steer Turning radius 29 5 25 6 8 m 10 9 m 4 790 15 8 Min 12 800 Max 51 000 3 805 4 190 2 538 3 315 3 550 13 7 2 200 460 15 185 8 830 3 950 8 58...

Страница 2: ...UM Root diameter x wide 0 362 m x 0 681 m Wire rope diameter x length 19 mm x 147 m Drum capacity 346 m 7 layers Maximum single line pull 1st layer 89 1 kN 9 090 kgf Maximum permissible linepull wire...

Страница 3: ...verse speeds constant mesh 3 speeds high range 2 wheel drive 4 wheel drive 3 speeds low range 4 wheel drive TRAVEL SPEED 36 km h GRADE ABILITY tan 85 at stall 30 Machine should be operated within the...

Страница 4: ...ty latch Mass approx 500 kg Hook block 35 t capacity 3 sheaves swivel type with safty latch Mass approx 450 kg Heavy duty lift device used at lifting more than 82 t Wind speed indicator Air craft warn...

Страница 5: ...ion and subsequent radius and boom angle change must be accounted for when applying load to hook 0 52 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 0 2 4 6 8 10 12 14 16 18 20...

Страница 6: ...56 58 60 58 56 54 52 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 NOTE Jib geometry shown are for unloaded condition and machine standing level on rm supporting surface Boom...

Страница 7: ...0 11 20 10 90 18 60 17 50 15 30 15 30 12 50 12 80 10 60 10 50 9 40 15 60 15 20 15 30 14 30 12 50 12 50 9 90 10 00 9 40 11 50 11 10 13 90 12 00 11 70 10 60 8 60 9 10 9 00 8 20 10 90 9 70 10 40 9 20 7 7...

Страница 8: ...12 50 12 80 10 60 10 50 9 40 16 30 15 90 15 30 14 30 12 50 12 50 9 90 10 00 9 40 12 00 11 60 14 40 12 20 11 70 10 60 8 60 9 10 9 00 8 70 11 40 10 10 10 40 9 20 7 70 8 30 8 30 6 60 9 20 8 00 9 30 8 00...

Страница 9: ...5 20 24 80 22 30 15 30 15 30 12 50 12 80 11 20 10 90 21 60 20 50 15 30 15 30 12 50 12 80 10 60 10 50 9 40 19 00 18 60 15 30 14 30 12 50 12 50 9 90 10 00 9 40 14 60 14 20 15 30 12 20 11 70 10 60 8 60 9...

Страница 10: ...4 40 4 10 4 20 3 80 4 70 3 60 4 10 3 50 4 40 3 80 3 60 4 00 4 00 3 80 3 60 3 40 4 00 3 30 4 00 3 20 3 70 3 50 3 40 3 40 3 70 3 50 3 00 3 20 3 30 3 00 3 60 3 00 3 40 3 30 3 10 2 90 3 30 3 30 2 40 2 90...

Страница 11: ...20 5 20 4 70 6 60 5 70 5 60 5 20 4 50 4 50 5 20 5 20 4 50 4 70 4 70 6 60 5 10 5 40 4 70 4 40 4 30 5 20 4 90 4 40 4 70 4 70 4 40 6 10 4 60 5 10 4 30 4 30 4 10 5 00 4 50 4 20 4 70 4 70 4 30 5 20 4 10 4...

Страница 12: ...3 80 4 40 3 40 4 60 3 30 4 00 3 20 3 70 3 50 3 40 4 00 3 70 3 50 4 00 3 20 4 10 3 00 3 90 3 00 3 40 3 30 3 10 3 70 3 50 3 30 3 40 2 90 3 70 2 80 3 80 2 70 3 20 3 00 2 90 3 30 3 20 3 10 2 90 2 70 3 20...

Страница 13: ...5 0 5 5 6 0 6 5 7 0 7 5 8 0 8 5 9 0 10 0 11 0 12 0 14 0 16 0 18 0 20 0 22 0 24 0 26 0 Telescoping mode 2nd Boom 0 1 2 0 2 0 2 3rd Boom 0 33 67 4th Boom 0 33 67 Top Boom 0 33 67 360 Rotation A Boom len...

Страница 14: ...2 0 2 0 2 3rd Boom 0 33 67 4th Boom 0 33 67 Top Boom 0 33 67 A B 12 8 22 4 31 9 4 0 4 5 5 0 5 5 6 0 6 5 7 0 7 5 8 0 8 5 9 0 10 0 11 0 12 0 14 0 16 0 18 0 20 0 22 0 24 0 26 0 Telescoping mode 2nd Boom...

Страница 15: ...thin 2 degrees in front of chassis When boom is out of 2 degrees in front of chassis 360 capacities are effective 7 On rubber lifting with jib is not permitted Maximum permissible boom length is 31 9...

Страница 16: ...ER AML E2 before operation Maximum lifting capacity is restricted by the number of parts of line of AUTO MATIC MOMENT LIMITER AML E2 Limited capacity is as determined from the formula Single line pull...

Страница 17: ...f the AUTOMATIC MOMENT LIMITER AML E2 is below the 360 lifting capacity This machine is equipped with an automatic slewing stopping device For the details see Operation and Maintenance Manual But oper...

Страница 18: ...MEMO...

Страница 19: ...MEMO...

Страница 20: ...12 Kamezawa 2 chome Sumida ku Tokyo 130 0014 Japan Tel 81 0 3 3621 7750 Fax 81 0 3 3621 7785 www tadano com info tadano com E mail URL International Sales Division SPEC SHEET NO GR 1000E 4 00101 EX 0...

Отзывы: