• Put the belt into the desired position. (S1 or S2).
• Retension the belt with the tension handle (12).
• Close the lower guard.
Rpm range:
Rpm stage 1 360 m/min.
For processing hardwood, materials similar to hardwood and for fine cuts
Rpm stage 2 720 m/min.
For processing softwood, and for less fine cuts
8.9 Sawblade guiding (Fig. 14)
The sawblade guiding (4) is adjusted with the fixing button (13).
The upper sawblade guiding can be set from 0 to 175 mm work piece height.
A clearance as small as possible to the work piece ensures an optimum sawblade guiding and safe
working.
Back pressure bearings (Fig. 15+16)
The back pressure bearings (e) accept the feed pressure of the work piece. Set the upper and lower
back pressure bearing in such a way that it slightly touches the sawblade back. Tighten the screws
(g). The distance should be 0.5 mm.
Upper guide rollers (Fig. 15)
Set the upper guide rollers (f) to the corresponding sawblade width. The front edges of the guide
rollers must not exceed the tooth base of the sawblade. When the guide rollers slightly touch the
sawblade, tighten the screws (g).
Lower guide rollers (Fig. 16)
Set the lower guide rollers (i) to the corresponding sawblade width. The front edges of the guide roll-
ers must not exceed the tooth base of the sawblade. When the guide rollers slightly touch the
sawblade, tighten the screws (h).
The sawblade must not jam!
Storing the push rod (Fig. 17)
In order to have the push rod (R) to hand at all times,
hang it on the device (j) intended for this, at the top left side of your band saw.
8.10 Transverse cutting gauge (14) (Fig. 18)
• Slide lateral stop (o) into a groove (k) in the saw bench.
• Release the grip screw (l).
Содержание PBS01A
Страница 1: ...Model PBS01A ...
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 5: ...Fig 8 P k Fig 8 1 1 8 18 1 5 L M o k Q Fig 7 3 Fig 7 4 d ...
Страница 6: ......
Страница 7: ......
Страница 8: ......