Each machine has already been tested at the factory and is delivered with initial settings pre-
programmed.
We recommend a 15 minutes warm up time before initial operation so that the machine can reach
optimal operation temperature.
However, temperature differences can change the touch screen settings so that they are no longer
correct. Therefore, when a machine is put in operation for the first time, we recommend perform-
ing a Touch screen calibration
1.
Connect the power cord:
Open the Main door
Insert the power cord from the back into the machine and plug it into the socket on the
rocker switch
2.
Turn on the machine:
Turn on the rocker switch
The machine will boot and the program starts automatically
3.
Touch screen calibration:
a) enter the Operator menu by turning on the operator switch
•
select Test mode and press button perform touch calibration
•
sit in a perfectly straight way, well-centered position, at a 90
◦
angle in front of the
machine and follow the instructions on the display exactly
or
b) enter the Supervisor or Attendant 1/2/3 menu by inserting the corresponding EKEY
•
select menu Basic Settings
•
press button perform touch calibration
•
sit in a perfectly straight way, well-centered position, at a 90
◦
angle in front of the
machine and follow the instructions on the display exactly
4.
Setting the volume:
a) enter the Operator menu by turning on the operator switch - adjust the volume on the
top page by using the slider
or
b) enter the Supervisor or Attendant 1/2/3 menu by inserting the corresponding EKEY
•
select menu Basic Settings
•
adjust the volume by using the slider
Page: 9
Содержание Golden Island Nevada
Страница 1: ......
Страница 2: ......
Страница 8: ......
Страница 20: ...This dialog prompts you to insert or remove an USB stick at the PC Page 12...
Страница 50: ...18 JCM UBA 10 SS Bill Acceptor maintenance Page 42...
Страница 52: ...Page 44...
Страница 63: ...24 Declaration of CE conformity Page 55...
Страница 71: ...27 Notes Nevada LT EN Page 63...