10
• The unit is correctly wired
8
Commissioning
Follow the first startup instructions and fill in the
Commissioning record
as you go through the settings.
The Startup Wizard cannot be skipped.
Select language, set the time and choose airflow control type. Select revolutions per minute as the type of airflow con-
trol only if these values are included with the device.
Set speed of supply and extract air fans for each level. When finished, review your settings. It is possible to go back to
previous menus and make modifications. Finally choose heating type or none. Finish startup wizard with OK button.
All additional changes post-startup wizard must be recorded in the
Commissioning record
.
9
Concluding Routines
Perform the following procedures before leaving the site:
1. Ensure that the product is operational and that no alarms are active.
2. If applicable, save the configuration backup.
3. Make sure that the
Commissioning record
is complete.
4. Collect all tools.
5. Inform the appropriate person that work is finished.
6. Follow the procedures for the return and disposal of replacement parts and the disposal of packing.
229391 | v02