10/48 |
FDR-3G…OF
Assessed Performance - FDR-3G
19
CE
1396
Systemair Production a.s.
Hlavná 371, 900 43 Kalinkovo, Slovakia
1396-CPR-0162, FDR-3G
(valid for subgroups: …EX, …KS, …OF)
EN 15650 : 2010
Circular fire dampers
Nominal activation conditions/sensitivity -
Pass
sensing element load bearing capacity
sensing element response temperature
Response delay (response time) -
Pass
closure time
Operational reliability -
Pass
motorized cycle = 10.200 cycles
manual cycle = 50 cycles
modulated = 20.200 cycles
Fire resistance:
Resistivity depending on installation method and situation
integrity
E
maintenance of the cross section (under E)
mechanical stability (under E)
cross section (under E)
insulation
I
smoke leakage
S
Durability of response delay -
Pass
sensing element response temperature and load bearing capacity
Durability of operational reliability -
Pass
open and closing cycle
Содержание FDR-3G
Страница 1: ...FDR 3G OF Overflow Fire Damper FDR 3G ...
Страница 5: ...5 48 FDR 3G OF AM FD Activation Mechanisms CBR FD Cover Boards ...
Страница 9: ...9 48 FDR 3G OF P15 Grid P16 Extended ductwork ...
Страница 13: ...13 48 FDR 3G OF Dimensions Free area Dimensions Note 3 Inclusive bearing Overhangs Weights ...
Страница 15: ...15 48 FDR 3G OF ø 250 DN ø630 Standardardly in position B On demand in position L T ...
Страница 19: ...19 48 FDR 3G OF ...
Страница 20: ...20 48 FDR 3G OF ...
Страница 23: ...23 48 FDR 3G OF ...
Страница 24: ...24 48 FDR 3G OF ...
Страница 27: ...27 48 FDR 3G OF ...
Страница 28: ...28 48 FDR 3G OF ...
Страница 31: ...31 48 FDR 3G OF ...
Страница 32: ...32 48 FDR 3G OF ...
Страница 48: ...Systemair DESIGN 2020 10 23 HandBook_FDR_3G_OF_en GB 8519DCD0 0720 11EB DCA1 21ABDD8D93BC ...