background image

5

LIFTING AND/OR SUPPORTING THE UNIT

The ERV series units are factory equipped with rigging holes which should be used to hoist and install the unit.  

A forklift may be used in the appropriate frame openings.  A spreader must be used in instances where the upper casing of the unit could be damaged.  
See Table 1 for details on unit weight and dimensions or for the exact weight, see the bill of lading.

Figure 5: Rigging the unit

INSTALLATION – CONT.

Figure 4: Roofcurb detail for ERV3200/4600 RT-EC

Bottom View

*NOTE: Standard curb heights 
are 12” (305mm), 18” 
(475mm), 24” (610mm)

**NOTE: Drawings are not 
to scale

Eletrical Wire Channel

862

331

309

1694

609.6

1627

1175

1134

77.8

1261

25.4

Supply Air Opening

Return Air Opening

1070

40

76

677

423

367

113

98

Содержание ERV RT-EC Series

Страница 1: ...ed by measuring the airflow of the Energy Recovery Ventilator It is always important to assess how the operation of any ERV may interact with vented com bustion equipment i e Gas Furnaces Oil Furnaces...

Страница 2: ...ion fees are the responsibility of the purchaser The purchaser is responsible for ensuring that applicable local and national codes are observed The warranty is limited to 3 years on parts including m...

Страница 3: ...Furnaces Oil Furnaces Wood Stoves etc NEVER install a ventilator in a situation where its normal operation lack of operation or partial failure may result in the backdrafting or improper functioning...

Страница 4: ...the curb See Figures 3 4 for curb dimensions The gasketing of the unit to the roofcurb is critical for a watertight seal Gasket is factory installed to the bottom of the unit Ensure gasket has not bee...

Страница 5: ...of the unit could be damaged See Table 1 for details on unit weight and dimensions or for the exact weight see the bill of lading Figure 5 Rigging the unit INSTALLATION CONT Figure 4 Roofcurb detail f...

Страница 6: ...visions using a spreader system provided by others which protects the upper exterior of the Sys temair Energy Recovery Unit during lifting Before placing the unit into position ensure the supply and e...

Страница 7: ...normally be operated from various starting devices from start stop switches remote panels time clock devices and or other interlocks Prior to starting the unit check to see that all circuit interlock...

Страница 8: ...actions taken and the name of the service person are required Frequency of maintenance required should be determined by inspection The Systemair Energy Recovery Unit requires minimal maintenance in c...

Страница 9: ...9 NOTES...

Страница 10: ...10 NOTES...

Страница 11: ...11 NOTES...

Страница 12: ...right to make changes and improvements to the contents of this manual without prior notice Systemair Inc 50 Kanalflakt Way Bouctouche NB E4S3M5 Canada Phone 1 800 263 7081 10048 Industrial Blvd KS 662...

Отзывы: