background image

1

IMPORTANT -  PLEASE READ THIS MANUAL 

BEFORE INSTALLING UNIT

ERV RT-EC SERIES

Outdoor Energy Recovery Ventilator

Installation Manual

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

CAUTION - 

Before installation, careful consideration must be given to how this system 

will operate if connected to any other piece of mechanical equipment, i.e. air handler, operat-
ing at a higher static. After installation, the compatibility of the two pieces of equipment 
should be confirmed by measuring the airflow of the Energy Recovery Ventilator.
It is always important to assess how the operation of any ERV may interact with vented com-
bustion equipment (i.e. Gas Furnaces, Oil Furnaces, Wood Stoves, etc.). 

NEVER - 

install a ventilator in a situation where its normal operation, lack of operation or par-

tial failure may result in the backdrafting or improper functioning of vented combustion equipment!!!

Your ventilation system should be installed in conformance with the appropriate provincial or state requirements 
or in the absence of such requirements with the current edition of the National Building Code, and / or 
ASHRAE’s “ Good Engineering Practices”.

Содержание ERV RT-EC Series

Страница 1: ...ed by measuring the airflow of the Energy Recovery Ventilator It is always important to assess how the operation of any ERV may interact with vented com bustion equipment i e Gas Furnaces Oil Furnaces...

Страница 2: ...ion fees are the responsibility of the purchaser The purchaser is responsible for ensuring that applicable local and national codes are observed The warranty is limited to 3 years on parts including m...

Страница 3: ...Furnaces Oil Furnaces Wood Stoves etc NEVER install a ventilator in a situation where its normal operation lack of operation or partial failure may result in the backdrafting or improper functioning...

Страница 4: ...the curb See Figures 3 4 for curb dimensions The gasketing of the unit to the roofcurb is critical for a watertight seal Gasket is factory installed to the bottom of the unit Ensure gasket has not bee...

Страница 5: ...of the unit could be damaged See Table 1 for details on unit weight and dimensions or for the exact weight see the bill of lading Figure 5 Rigging the unit INSTALLATION CONT Figure 4 Roofcurb detail f...

Страница 6: ...visions using a spreader system provided by others which protects the upper exterior of the Sys temair Energy Recovery Unit during lifting Before placing the unit into position ensure the supply and e...

Страница 7: ...normally be operated from various starting devices from start stop switches remote panels time clock devices and or other interlocks Prior to starting the unit check to see that all circuit interlock...

Страница 8: ...actions taken and the name of the service person are required Frequency of maintenance required should be determined by inspection The Systemair Energy Recovery Unit requires minimal maintenance in c...

Страница 9: ...9 NOTES...

Страница 10: ...10 NOTES...

Страница 11: ...11 NOTES...

Страница 12: ...right to make changes and improvements to the contents of this manual without prior notice Systemair Inc 50 Kanalflakt Way Bouctouche NB E4S3M5 Canada Phone 1 800 263 7081 10048 Industrial Blvd KS 662...

Отзывы: