99/105 |
S-BM2
S-BM2 Handling & Manipulation
The S-BM2 is made of boards and can thus be considered fragile. Handling and manipulation must be done with
care. Smaller dimensions can be manipulated and placed in the installation opening by two persons. Bigger dimensions
are supplied with wooden blocks, those serve as support for suitable lifting equipment (forklift, crane). Please follow
both textual and graphic instructions:
1.Unpack the damper and place it in vertical position.
2.Remove grille and place the holder between the upper-most blade and the frame.
3.Carefully lift the smoke control damper with the forklift, crane.
4.Prepare the opening, damper hanger, connection surfaces and/or filling as per the desired installation type.
5.Place the smoke control damper in the opening (wall installation) or on the opening (duct installation).
6.Once the smoke control damper has been placed fix the damper to ductwork:
a) For wall installation - insert the filling as per desired installation.
b) For duct installation – fix the hangers so that the weight of the damper is supported.
7.Carefully remove the fork.
8.Remove the wooden support.
9.If the ductwork ends with the damper – install a grille or grilles.
Содержание A-S-BM2
Страница 1: ...S BM2 Smoke Control Damper MA multi ...
Страница 16: ...16 105 S BM2 Dimensions of grille type M0 M1 in battery type assembly ...
Страница 26: ...26 105 S BM2 ...
Страница 27: ...27 105 S BM2 ...
Страница 28: ...28 105 S BM2 ...
Страница 29: ...29 105 S BM2 Opening and wall ceiling preparations ...
Страница 30: ...30 105 S BM2 Damper minimum distances ...
Страница 32: ...32 105 S BM2 Battery Installation Grille type M0 M1 ...
Страница 33: ...33 105 S BM2 ...
Страница 34: ...34 105 S BM2 Fixing layout for battery installations ...
Страница 35: ...35 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Страница 38: ...38 105 S BM2 ...
Страница 39: ...39 105 S BM2 ...
Страница 40: ...40 105 S BM2 ...
Страница 41: ...41 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Страница 44: ...44 105 S BM2 ...
Страница 45: ...45 105 S BM2 ...
Страница 46: ...46 105 S BM2 ...
Страница 47: ...47 105 S BM2 Opening and wall ceiling preparations ...
Страница 48: ...48 105 S BM2 Damper minimum distances ...
Страница 51: ...51 105 S BM2 ...
Страница 52: ...52 105 S BM2 ...
Страница 53: ...53 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Страница 55: ...55 105 S BM2 Battery Installation Grille type M0 M1 ...
Страница 56: ...56 105 S BM2 ...
Страница 57: ...57 105 S BM2 Fixing layout for battery installations ...
Страница 58: ...58 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Страница 61: ...61 105 S BM2 ...
Страница 62: ...62 105 S BM2 ...
Страница 63: ...63 105 S BM2 ...
Страница 64: ...64 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Страница 67: ...67 105 S BM2 ...
Страница 68: ...68 105 S BM2 ...
Страница 69: ...69 105 S BM2 Opening and wall ceiling preparations ...
Страница 72: ...72 105 S BM2 ...
Страница 75: ...75 105 S BM2 ...
Страница 78: ...78 105 S BM2 ...
Страница 79: ...79 105 S BM2 ...
Страница 82: ...82 105 S BM2 ...
Страница 83: ...83 105 S BM2 ...
Страница 84: ...84 105 S BM2 ...
Страница 87: ...87 105 S BM2 ...
Страница 88: ...88 105 S BM2 ...
Страница 89: ...89 105 S BM2 ...
Страница 90: ...90 105 S BM2 ...
Страница 100: ...100 105 S BM2 ...
Страница 101: ...101 105 S BM2 ...
Страница 105: ...Systemair DESIGN 2021 06 29 Handbook_S_BM2_en GB ...