85/105 |
S-BM2
Damper minimum distances
Legend for installation D1V, D2V - Vertically Oriented Damper, On the Duct
1
- Smoke control damper S-BM2
2
- Connected ductwork made of Promatect-L500 boards (min. 500 kg/m3, Promat)
5
- Grille
8
- Cover plates made of Promatect (min. 500 kg/m3, Promat)
A2
- Hanger accessory H1-S-BM2 - can be made on site using 3 mm sheet metal plate.
• For sizes W<550 or H<425 use 2 pieces on two damper edge. Total 4 pcs.
• For sizes bigger than W=550 or H=425 use 3 pieces on each damper edge. Total 6 pcs.
F4
- Nails or pins per ductwork manufacturer instructions
F5
- Fire resistive coating Promat K84 (Promat)
X, Y
- Cutting planes
Содержание A-S-BM2
Страница 1: ...S BM2 Smoke Control Damper MA multi ...
Страница 16: ...16 105 S BM2 Dimensions of grille type M0 M1 in battery type assembly ...
Страница 26: ...26 105 S BM2 ...
Страница 27: ...27 105 S BM2 ...
Страница 28: ...28 105 S BM2 ...
Страница 29: ...29 105 S BM2 Opening and wall ceiling preparations ...
Страница 30: ...30 105 S BM2 Damper minimum distances ...
Страница 32: ...32 105 S BM2 Battery Installation Grille type M0 M1 ...
Страница 33: ...33 105 S BM2 ...
Страница 34: ...34 105 S BM2 Fixing layout for battery installations ...
Страница 35: ...35 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Страница 38: ...38 105 S BM2 ...
Страница 39: ...39 105 S BM2 ...
Страница 40: ...40 105 S BM2 ...
Страница 41: ...41 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Страница 44: ...44 105 S BM2 ...
Страница 45: ...45 105 S BM2 ...
Страница 46: ...46 105 S BM2 ...
Страница 47: ...47 105 S BM2 Opening and wall ceiling preparations ...
Страница 48: ...48 105 S BM2 Damper minimum distances ...
Страница 51: ...51 105 S BM2 ...
Страница 52: ...52 105 S BM2 ...
Страница 53: ...53 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Страница 55: ...55 105 S BM2 Battery Installation Grille type M0 M1 ...
Страница 56: ...56 105 S BM2 ...
Страница 57: ...57 105 S BM2 Fixing layout for battery installations ...
Страница 58: ...58 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Страница 61: ...61 105 S BM2 ...
Страница 62: ...62 105 S BM2 ...
Страница 63: ...63 105 S BM2 ...
Страница 64: ...64 105 S BM2 Opening and wall ceiling preparations Damper minimum distances ...
Страница 67: ...67 105 S BM2 ...
Страница 68: ...68 105 S BM2 ...
Страница 69: ...69 105 S BM2 Opening and wall ceiling preparations ...
Страница 72: ...72 105 S BM2 ...
Страница 75: ...75 105 S BM2 ...
Страница 78: ...78 105 S BM2 ...
Страница 79: ...79 105 S BM2 ...
Страница 82: ...82 105 S BM2 ...
Страница 83: ...83 105 S BM2 ...
Страница 84: ...84 105 S BM2 ...
Страница 87: ...87 105 S BM2 ...
Страница 88: ...88 105 S BM2 ...
Страница 89: ...89 105 S BM2 ...
Страница 90: ...90 105 S BM2 ...
Страница 100: ...100 105 S BM2 ...
Страница 101: ...101 105 S BM2 ...
Страница 105: ...Systemair DESIGN 2021 06 29 Handbook_S_BM2_en GB ...