5.
Place the enclosed nuts on the M6 threaded bolts at the back of
the front panel and screw them tight.
The following data applies to the front panel for IP65-compliant
installation with a surrounding seal at the rear:
n
Ø 4 mm
n
glued into a 3 mm-deep machined groove
n
Tension-relief cable guidance clamps can be attached to the
M3 threaded bolts
Optionally, instead of the M6 threaded bolts, the device can be
fastened by boring holes in the front panel.
ð
The device is mounted and sealed.
Protection factor IP65 is guaranteed only if the switch cabinet
or control panel is sufficiently rigid, the device is properly
installed using the supplied nuts and bolts and with a prop-
erly seated seal.
Optionally counterbores may be attached to the threads. Please insert
the attached O-rings.
Fig. 21: Counterbore
Starting up
Mounting the device
CONTROL 217 PC - Industrial PC
25
Содержание CONTROL 217 PC
Страница 4: ...Table of contents CONTROL 217 PC Industrial PC 4 ...
Страница 6: ...General information Copyright notice CONTROL 217 PC Industrial PC 6 ...
Страница 10: ...Safety Important safety notes CONTROL 217 PC Industrial PC 10 ...
Страница 22: ...Product description Conformity CONTROL 217 PC Industrial PC 22 ...
Страница 26: ...Starting up Mounting the device CONTROL 217 PC Industrial PC 26 ...
Страница 34: ...Repairs CONTROL 217 PC Industrial PC 34 ...
Страница 38: ...Packaging and transport Transporting the device CONTROL 217 PC Industrial PC 38 ...
Страница 40: ...Disposal CONTROL 217 PC Industrial PC 40 ...