Installation Checklist
System
Installation date
Customer's name
Customer's address
Tank serial number
Collector serial number
Installer name
INSTALLATION Checklist
Was the installation carried out in accordance with the rules on health and safety at work?
Has the system been installed according to this installation manual?
Is the minimum distance from the edges of the roof 1.5 m?
Have the pipe connections through the roof been properly sealed?
Are all screws and mechanical connections properly tightened and double checked?
Have the safety group, the pressure reducer and the thermostatic mixer been installed and their
use checked?
Are all hydraulic connections securely tightened and has the system been checked for leaks?
Has the cover on the collector been removed after installation?
Has the protective film on the storage tank removed before commissioning?
Does the system produce domestic hot water during sunny periods?
Has the customer been informed about the use of this system and have they been given to this manual?