50
Synopsys, Inc.
5.60a
March 2020
Status LEDs
PCIe IP Prototyping Kit Installation Guide
A.2
HAPS-80 Power-Up Sequence
During the power-up sequence, the supervision LEDs (RESET, READY, ALERT and PWR) change color.
After a successful power-up sequence, all LEDs must be green. The following list represents the color code
for the supervision LEDs.
indicates the different stages during the HAPS-80 power-up procedure and associated LED color
code.
Green Amber
Red
Unlit
Table A-2
HAPS-80 Power-up Supervision LEDs
LED
Power-up Procedure
Action
RESET
READY
ALERT
PWR
Supervisor - Power On
OK
ERROR
Stop
Supervisor Design- Loaded
OK
ERROR
Stop
Supervisor Firmware - Check and Load OK
Error
Stop
Power - Check
OK
Error
Stop
Slave Systems Version - Check
OK
Error
Stop
Startup Project - Load
Yes
No
Continue
Startup Project - Loaded Successfully
Yes
Error
Continue
Control Module – Power On
OK
ERROR
Stop