26
www.synexis.ca
+1 844-352-7680
Installation (cont.)
Remove the electrical box cover and the
knockout from the electrical housing on
the desired side for wiring purposes.
The view port on the bottom of the Sail
frame should be glowing purple. This
indicates power is running to the
Synexis Blade Inline System and the
bulb is operational.
Remove the Sail (the photocatalytic
Sail) from the plastic bag it was stored
in. Locate the four (4) push rivets on the
base of the unit. Gently insert the Sail
with the Sail frame oriented so that the
push rivets line up.
The unit is designed so that the Sail can
only be inserted in the correct orientation
or the push rivets will not line up.
Mount the unit base to the duct using
the provided eight (8) self-tapping
screws and a drill or impact driver with
the 1/4″ hex driver bit inserted.
Wire the recommended switch and
ballast using 120 VAC (for US). Check
with NEC standards, NFPA standards
and local electrical codes for the
required wire type, size and connectors.
Replace the electrical box cover and
apply power to the unit.
Rotate the knob at the top of the Sail
frame 180 degrees so that the clip at
the top of the Sail frame holds the Sail
in place. After the photocatalytic Sail
has been installed into the Sail frame,
insert the Sail frame back into the unit
and attach the four snap rivets on the
base of the unit.
Power on and inspect your Synexis Blade Inline System