![Synergy E7SE Скачать руководство пользователя страница 38](http://html1.mh-extra.com/html/synergy/e7se/e7se_assembly-instructions-manual_1420737038.webp)
Optional - Securing Fore Boom
Align boom flush with front boom clamp
1.
Mark hole through threaded front boom clamp.
2.
Do not drill hole at rear boom clamp location! This will weaken boom at high stress point!
3.
Drill 3mm hole through marked side of boom(6.5mm from edge of boom)
4.
Install M3x6 Button Head Bolt with blue loctite to secure boom
5.
Tail Boom
Fore most boom clamp
101-306 M3x6 Button Head
Drill hole at 6.5mm or use Boom Clamp as template
to mark boom. Do not drill through boom clamp threaded
hole with 3mm drill bit. You will remove all threads!
Page 36
WWW.SYNERGYRCHELICOPTERS.COM
Содержание E7SE
Страница 16: ...100 312 M3x12 Socket Head Landing Gear Install Page 14 WWW SYNERGYRCHELICOPTERS COM...
Страница 18: ...100 308 M3x8 Socket Head 100 308 M3x8 Socket Head Main Boom Clamp Install Page 16 WWW SYNERGYRCHELICOPTERS COM...
Страница 26: ...Align Holes Main Gear to Spur Gear Assembly Page 24 WWW SYNERGYRCHELICOPTERS COM...
Страница 48: ...365 mm 1330 mm Synergy E7SE Completed Page 46 WWW SYNERGYRCHELICOPTERS COM...