![Synergy E7SE Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/synergy/e7se/e7se_assembly-instructions-manual_1420737037.webp)
Optional - Securing Tail Box
101-306 M3x6 Button Head
Tail Box
Tail Boom
Ensure Tail Box is correctly aligned with helicopter.
1.
Mark tail boom by measuring 26.5mm or by using tail box as template
2.
Drill 3mm hole at 26.5mm
3.
Secure with blue Loctite and M3x6 Button Head
4.
Optional but highly recommended, if your tail box departs from your boom because you forgot to pinch
the boom clamp, you will wish you took the extra time to do this step! This entire procedure can be done after the
torque tube system is installed, just be careful not to drill into your torque tube shaft!
Hole drilled at 26.5mm
Page 35
Содержание E7SE
Страница 16: ...100 312 M3x12 Socket Head Landing Gear Install Page 14 WWW SYNERGYRCHELICOPTERS COM...
Страница 18: ...100 308 M3x8 Socket Head 100 308 M3x8 Socket Head Main Boom Clamp Install Page 16 WWW SYNERGYRCHELICOPTERS COM...
Страница 26: ...Align Holes Main Gear to Spur Gear Assembly Page 24 WWW SYNERGYRCHELICOPTERS COM...
Страница 48: ...365 mm 1330 mm Synergy E7SE Completed Page 46 WWW SYNERGYRCHELICOPTERS COM...