1-3-2
DVDN_ISP
Safety Check after Servicing
Examine the area surrounding the repaired location for damage or deterioration. Observe that screws, parts, and
wires have been returned to their original positions. Afterwards, do the following tests and confirm the specified
values to verify compliance with safety standards.
1. Clearance Distance
When replacing primary circuit components, confirm
specified clearance distance (d) and (d’) between
soldered terminals, and between terminals and
surrounding metallic parts. (See Fig. 1)
Table 1: Ratings for selected area
Note:
This table is unofficial and for reference only. Be
sure to confirm the precise values.
2. Leakage Current Test
Confirm the specified (or lower) leakage current
between B (earth ground, power cord plug prongs) and
externally exposed accessible parts (RF terminals,
antenna terminals, video and audio input and output
terminals, microphone jacks, earphone jacks, etc.) is
lower than or equal to the specified value in the table
below.
Measuring Method (Power ON):
Insert load Z between B (earth ground, power cord plug
prongs) and exposed accessible parts. Use an AC
voltmeter to measure across the terminals of load Z.
See Fig. 2 and the following table.
Table 2: Leakage current ratings for selected areas
Note:
This table is unofficial and for reference only. Be sure to confirm the precise values.
AC Line Voltage
Clearance Distance (d), (d’)
120 V
≥
3.2 mm (0.126 inches)
AC Line Voltage
Load Z
Leakage Current (i)
Earth Ground (B) to:
120 V
0.15
µ
F CAP. & 1.5 k
Ω
RES.
Connected in parallel
i
≤
0.5 mA Peak
Exposed accessible parts
Chassis or Secondary Conductor
Primary Circuit
Fig. 1
d'
d
AC Voltmeter
(High Impedance)
Exposed Accessible Part
B
Earth Ground
Power Cord Plug Prongs
Z
Fig. 2
Содержание CSHP80G
Страница 1: ...SERVICE MANUAL DVR HDD with DVD Player CSHP80G...
Страница 33: ...1 11 4 AV 2 5 Schematic Diagram E41A1SCAV2...
Страница 34: ...1 11 5 AV 3 5 Schematic Diagram E41A1SCAV3...
Страница 35: ...1 11 6 AV 4 5 Schematic Diagram E41A1SCAV4...
Страница 38: ...1 11 9 SW Schematic Diagram E41A1SCSW ATA Schematic Diagram E41A1SCAT...
Страница 39: ...1 11 10 DVD Main 1 3 Schematic Diagram E41A1SCD1 1 NOTE Either IC461 or IC462 is used for DVD MAIN CBA UNIT...
Страница 40: ...1 11 11 DVD Main 2 3 Schematic Diagram E41A1SCD2...
Страница 41: ...1 11 12 DVD Main 3 3 Schematic Diagram E41A1SCD3...
Страница 45: ...1 11 16 BE41A0F01011A AV CBA Top View...
Страница 57: ...1 17 2 E41A1PEX Packing S3 S2 S1 X10 S10 S2 X20 X4 A7 X3 X1 X2 X5...
Страница 65: ...CSHP80G E41A1CD 2006 4 14...