Chapter 3 Operational Verification
59552A/59553A Operational Verification
3-4
User’s Guide
59552A/59553A Operational Verification
This test will require that all eight fiber-optic outputs (
Ch 1
through
Ch 8
) on the 59552A be tested.
Setup
1
Ensure that both the 59552A and 59553A are set to the factory default
two-signal combined operation.
Refer to Chapter 2, “Configuring Your 59552A/59553A,” in this guide
for assistance in determining this operating mode. If each of the
instruments was directly received from the factory, these defaults
should already be set up.
2
Connect the equipment as shown in Figure 3-1 to begin testing of the
first fiber-output channel (
Ch 1
) of the 59552A.
Figure 3-1. Operational Verification Setup
HP 33120A
Function Genertor/
Arbitrary Waveform Generator
HP 54600B
Oscilloscope
Analog Out (IRIG)
HP 33120A
Function Genertor/
Arbitrary Waveform Generator
59552A
Fiber-Optic Distribution Amplifier
(Rear Panel)
Digital Out (1 PPS)
50
Ω
Feedthrough
(HP 10100C)
59553A
Fiber-Optic Receiver
(Rear Panel)
Fiber
Optic
In
Ch 1
Analog In (IRIG)
Digital In
(1 PPS)
BNC Cable
BNC Cable
Fiber-Optic
Cable
Содержание 59552A
Страница 8: ...In This Guide viii User s Guide ...
Страница 9: ...1 Getting Started ...
Страница 19: ...2 Configuring Your 59552A 59553A ...
Страница 41: ...3 Operational Verification ...
Страница 47: ...4 Specifications ...