
Preparing for hardware
installation
This chapter includes the following topics:
■
■
■
■
■
■
Checking the shipping packages
Tools
The following tools and supplies are required for hardware installation.
■
Phillips screwdrivers M3-M6
■
Knife (for opening cartons)
■
ESD preventive wrist strap or gloves
■
Cable labels
■
Pen or pencil with which to write on labels
■
Cable ties and diagonal cutting pliers (optional)
■
Multimeter (optional)
3
Chapter
Содержание NetBackup 5230
Страница 1: ...Symantec NetBackup 5230 Appliance Hardware Installation Guide Release 2 6 1 2 21350324 ...
Страница 16: ...Introduction Product documentation 16 ...
Страница 22: ...Installation requirements Prerequisites for IPMI configuration 22 ...
Страница 28: ...Preparing for hardware installation Checking the shipping packages 28 ...
Страница 60: ...V validation appliance 44 NetBackup 5230 hardware checks 43 storage shelf 44 Index 60 ...