49
Fig.5
Fig.6
Fig.7
Fig.8
Fig.9
Fig.10
Mounting the front light
Finally, all you have to do is shrink the tubing over the Pull the pre-
viously connected plug (Fig.9) and heat with a hot-air dryer or care-
fully with a commercially available lighter until it contracts (Fig.10).
Before connecting the
two connectors (Fig.5),
pull the supplied heat
shrink tube over one
cable end (Fig.6 - Fig.7),
then you can connect
the two connectors
together (Fig.8).
Содержание Buddy V2 eKFV
Страница 1: ...Handbuch Manual SXT Buddy V2 eKFV...
Страница 3: ......
Страница 19: ...19 Aufklappen Parkposition Faltmechanisumus in Parkposition...
Страница 21: ...21 Zusammenklappen 2 3 4...
Страница 38: ...38 CE Zertifikat...
Страница 39: ......
Страница 41: ......
Страница 57: ...57 parking position Folding mechanism in parking position Unfolding the scooter...
Страница 59: ...59 Folding the scooter 2 3 4...
Страница 76: ...76 CE certificate...
Страница 77: ......