12
Installation, Maintenance, & User Manual
STEP 1
Front Ladder Wall Sub-Assembly
• Lay Posts A5 and A8 on the ground with feet facing up.
• Loosely attach Ladder C6 following bolt direction as shown.
• Place Split Railing C7 with the horizontal lines of the wire mesh face down (to be on the outside of the tower
once assembled).
•
Attach Split Railing C7 using seven (7) 31/4” bolts and one (1) 31/2” bolt following bolt direction as shown with
the horizontal lines of the wire mesh facing down.
•
Once C6 and C7 are attached, tighten all bolts using a wrench with 1/2” socket, with the exception of the top
bolt between C7 and A8 if a swing bar will be added to A6 .
C2
A4
C6
PARTS REQUIRED:
Post
Post
Ladder
Split Railing
HARDWARE REQUIRED:
31/4
” bolt, 2 washers, lock washer, nut
x8
A6
A4
A6
C2
C6
C2
A4
C6
A6
A6
C2
C6
C6
31/4”
31/4”
31/4”
31/4”
31/4”
31/4”
31/4”
31/4”
C6
A6
Содержание SlimSesh SS2
Страница 2: ......
Страница 29: ...27 w w w s w i n g s e s h c o m...