13
STEP 2
1. Assemble Frame B as shown above.
Note: Tap each T-Nut into its pre-drilled hole until the metal tangs sink fully into the wood.
FRAME B
Flush
6’’
6’’
PF 6063 3/4’
’ x 3-3/8’
’ x 59-5/8’
’
A-FRAME BASE
PF 6010 1’
’ x 3-3/8’
’ x 47-1/2’
’
PF 6006 3/4’
’ x 3-3/8’
’ x 44-1/2’
’
PF 6006 3/4’
’ x 3-3/8’
’ x 44-1/2’
’
31’’
1-1/2’’
ALL
JOINTS
(3)
2-1/2’’ Screws
(3)
2-1/2’’ Screws
(2)
2-1/2’’ Screws
(2)
2-1/2’’ Screws
(2)
2-1/2’’ Screws
2-1/2” Deck Screw (x18)
PF 6164 3’
’ x 3’
’ x 94’
’
PF 6164 3’
’ x 3’
’ x 94’
’
T-Nut
Small
(2)
2-1/2’’ Screws
5/16-18 X 4’’ Hex Head Bolt
5/16’’ Washer
5/16’’Loc-Washer
59-1/4’’
47-1/2’’
Содержание PB 8281
Страница 48: ...48 STEP 37 1 Attach Rock Wall as shown Underdeck View 2 1 2 Deck Screw x6 3 2 1 2 Screws per side ...
Страница 57: ...57 ...
Страница 58: ...58 ...