TECHNICAL SPECIFICATIONS
Tool
Pole Chainsaw
Model
EB212D
Voltage
40V
Battery pack
EB20 (2.0Ah)
Chain speed
60m/s
Saw rail length
7.87”
Max branch thickness
7.48”
Extension range of the
telescopic shaft
0 – 15.75”
Oil tank capacity
70 ml
Weight (without battery, guide
bar and saw chain)
6.61 lbs. (3.0 kg)
A-weighted sound pressure level according to ISO 22868, EN 3744
Sound Pressure Level
85 dB
Guaranteed Sound Power
Level
96 dB
Uncertainty K
3 dB
ASSEMBLY AND OPERATION
WARNING:
Switch the unit off and remove the battery
under the following conditions:
– if the unit is left unattended;
– before checking, cleaning or performing other
work on the unit;
– if the unit starts vibrating excessively.
Before initial operation
Unpack the garden tool and accessories and check that
no parts are missing or damaged.
NOTE:
The batteries (optional; depending on delivery
scope) are not fully charged on delivery. Prior to initial
operation, charge the batteries fully. See user manual of
the battery charger.
Lubricating the chain
CAUTION: The unit may be operated with adequate
chain lubricating oil only. Inadequate lubrication will
reduce the service life of the power tool.
•
Check the amount of oil on the oil level indicator.
Topping up the chain oil
–
Fill the oil tank only with an environmentally
compatible quality chain and bar lubricant (according to
RAL-UZ48).
– Do not use waste oil. Renewed contact with waste
can cause skin cancer. Waste oil is environmentally
harmful. Waste oil does not have the necessary
lubricating properties and is unsuitable for chain
lubrication.
–
An oil other than the one recommended may
damage the rail, the chain and the lubricating system.
–
Ensure that dirt does not get into the oil tank.
–
Avoid spilling oil. Always wipe up any spilled oil.
•
Open the oil tank cover (a). Before opening, clean
if required.
•
Carefully pour in the chain lubricating oil until it
reaches the upper mark on the oil level indicator
(b).
•
Close the oil tank cover (a).
•
Check the chain oil level even during
operation and top up with chain oil if
required
.
Checking the chain lubrication
•
Start the unit (see
section “Switching on/ off the
power tool”).
•
Hold running saw chain for some time approx. 15
cm above a suitable surface. If there is adequate
chain lubrication, the oil which is ejected by the
saw chain will form a light trail.
Chain tension
WARNING:
–
Before performing any work on the garden
tool, remove the battery.
–
The teeth on the saw chain are very sharp!
Wear protective gloves when performing any
work on the chain
Risk of injury!
NOTE:
Check and re-adjust the tension of a new chain
after working for a few minutes. Switch the motor off,
remove the battery and actuate the chain brake.
Checking the chain tension
The saw chain must not sag, but it should be possible to
pull it 2-3 millimeters off the saw rail in the middle of the
saw rail.
Tensioning the saw chain
•
Unscrew the handwheel anti-clockwise until
the saw rail can be moved by hand (1).
•
Turn the chain tensioning wheel on
counterclockwise to tension the chain (2).
•
Turn the saw chain by hand to check that it
runs perfectly. It must slide freely in the rail.
•
Tighten the handwheel to attach the rail and
the cover (3).