background image

Table of Contents 

 

 
 
Approved Use 

3

 

 

1.  Description of the SWI-TEC Mastlift 

3

 

 

 

1.1 Standard Features 

 

 
2.  Training 

5

 

 
3.  Installation 

5

 

 

 

3.1 Selection of the location 

 

3.2 Use of the device 

 

4.  Operating Instructions 

7

 

 

 

 

4.1 Lifting a Person 

 

4.2 Lowering a Person 

 

4.3 Operation of the Brake Mechanism 

 
5. 

Manufacturer’s Guidelines 

8

 

 
 

5.1 Checking the Drum Winch Before Each Use

 

 

5.1.1 Checking the Endless Line 

 

5.1.2 Checking the Drum Winch 

 
 

5.2 Maintenance of the Drum Winch

 

 

 

 

5.3 Storage of the Drum Winch

 

 
 

5.4 Care of the Drum Winch

 

 
 

5.5 Disposal of the Drum Winch

 

10 

 

6.  Commissioning Instructions 

10

 

 

 

Certificate German Lloyd 

12

 

 

 

 
 

 

 
 

 

 

Содержание Mastlift

Страница 1: ...User Manual for Drum Winch SWI TEC Mastlift Last revised Mai 21 2017 Issued by Marco Bachmann Managing Director Neveta Nautica S L...

Страница 2: ...Lifting a Person 7 4 2 Lowering a Person 7 4 3 Operation of the Brake Mechanism 7 5 Manufacturer s Guidelines 8 5 1 Checking the Drum Winch Before Each Use 8 5 1 1 Checking the Endless Line 9 5 1 2 C...

Страница 3: ...persons The drum winch has a Load Line which is wound on a drum With the use of an Endless Line the Load Line can be wound onto or off the drum In this way the person is lifted or lowered A pawl ratc...

Страница 4: ...force of about 26 daN is required on the Endless Line when a maximum load of 150 kg is applied to the top rope layer Load Line Cover material Polyester Core material Dyneema Diameter 6 mm Breaking St...

Страница 5: ...expected work location Consider it may need extra length if the person has to perform work offset from the vertical The Load Line must not be crossed and but must always be able to move freely If nec...

Страница 6: ...ints must be tested Approved connectors must meet the forces imparted by the anchorage points Attaching the device to crane hook is prohibited Caution A competent person must be consulted if the secur...

Страница 7: ...Line and continue to pull evenly The person is then lowered in a smooth motion 4 3 Operation of the braking system The brake mechanism engages automatically the load is securely held in any position...

Страница 8: ...his could induce dynamic loading forces which could exceed the maximum operating load Always locate the winch in such a manner that when raising and lowering the Load Line is prevented from chafing Th...

Страница 9: ...asons this service has to be performed by the manufacturer or personnel approved by the manufacturer in writing Only the manufacturer or personnel approved by the manufacturer in writing may repair th...

Страница 10: ...3 Press the Locking Lever black ball D and pull out the desired length of the Load Line F 4 After releasing the Locking Lever D the Load Line must be pulled out with a firm tug With this movement the...

Страница 11: ...es replace or add parts to the drum winch Production and Distribution Distribution Germany SWI TEC DE GmbH Im Yachthafen Potsdam Kastanienallee 22 C DE 14471 Potsdam Tel 49 0 331 87000 448 E mail info...

Страница 12: ...12...

Страница 13: ...13...

Отзывы: