background image

3.2   Use of the device 

 

The fixed anchorage point must have a safety factor of 10:1 for personnel, but 
at  least  be  suitable  for  a  force  absorption  of  7.5  kN.  For  the  second  safety, 
depending  on the intended use,  a separate solid anchorage point with a force 
absorption  capacity  of  7.5  kN  must  be  available  (second  halyard).  The 
anchorage  points  must  be  tested.  Approved  connectors  must  meet  the  forces 
imparted by the anchorage points. 
Attaching the device to crane hook is prohibited.

 

 

 
 
Caution

  

A  competent  person  must  be  consulted  if  the  security  of  the  anchorage  is  in 
question. 

 
 

 
 

1. Anchorage 

2. Anchorage 

 

Minimum Load Capacity: 7,5 kN 

Minimum Load Capacity: 7,5 kN 

 
 
 
 
 
 

Carabiner 

Carabiner 

 

Connectors (EN 362) 

Connectors (EN 362) 

 

 

 
 
 
 

Drum Winch SWI-TEC Mastlift 

Guided Type Fall Arrester 

 

 

(EN 353-2) or 
Retractable Type Fall 
Arrester (EN 360) 

 
 
 
 
 
 

Carabiner 

Carabiner 

 

Connectors (EN 362) 

Connectors (EN 362) 

 
 
 

   

 
 
 

Содержание Mastlift

Страница 1: ...User Manual for Drum Winch SWI TEC Mastlift Last revised Mai 21 2017 Issued by Marco Bachmann Managing Director Neveta Nautica S L...

Страница 2: ...Lifting a Person 7 4 2 Lowering a Person 7 4 3 Operation of the Brake Mechanism 7 5 Manufacturer s Guidelines 8 5 1 Checking the Drum Winch Before Each Use 8 5 1 1 Checking the Endless Line 9 5 1 2 C...

Страница 3: ...persons The drum winch has a Load Line which is wound on a drum With the use of an Endless Line the Load Line can be wound onto or off the drum In this way the person is lifted or lowered A pawl ratc...

Страница 4: ...force of about 26 daN is required on the Endless Line when a maximum load of 150 kg is applied to the top rope layer Load Line Cover material Polyester Core material Dyneema Diameter 6 mm Breaking St...

Страница 5: ...expected work location Consider it may need extra length if the person has to perform work offset from the vertical The Load Line must not be crossed and but must always be able to move freely If nec...

Страница 6: ...ints must be tested Approved connectors must meet the forces imparted by the anchorage points Attaching the device to crane hook is prohibited Caution A competent person must be consulted if the secur...

Страница 7: ...Line and continue to pull evenly The person is then lowered in a smooth motion 4 3 Operation of the braking system The brake mechanism engages automatically the load is securely held in any position...

Страница 8: ...his could induce dynamic loading forces which could exceed the maximum operating load Always locate the winch in such a manner that when raising and lowering the Load Line is prevented from chafing Th...

Страница 9: ...asons this service has to be performed by the manufacturer or personnel approved by the manufacturer in writing Only the manufacturer or personnel approved by the manufacturer in writing may repair th...

Страница 10: ...3 Press the Locking Lever black ball D and pull out the desired length of the Load Line F 4 After releasing the Locking Lever D the Load Line must be pulled out with a firm tug With this movement the...

Страница 11: ...es replace or add parts to the drum winch Production and Distribution Distribution Germany SWI TEC DE GmbH Im Yachthafen Potsdam Kastanienallee 22 C DE 14471 Potsdam Tel 49 0 331 87000 448 E mail info...

Страница 12: ...12...

Страница 13: ...13...

Отзывы: