Small SB-Flat Installation Report
Order
1
Check the installation environment before installing the machine
First Condition of the machine when techncian arrived at the plant
Start from opening the wood box when the machine is being moved to inside
Machine ready to be installed
During the machine assembly (process name: )
Machine assembly completed
Other ( )
(1) Temperature, Humidity and Others
Pass
Fail
(2) On which floor :
(3) Material of the floor :
(4) Levelness on Floor
Pass
Fail
(5) Machine Voltage Specification :
6) Input Voltage : 1P ( V )
2
Check machine installation and exterior conditions
(1) Machine Installation
- Check Machien Levelness
Pass
Fail
- Adjust Machine Levelness by Leveling Bolt in case it is not correct.
Pass
Fail
(2) Check X-Frame Movement
- Check X-Frame Movement
Pass
Fail
- Check it after adjsuting Sensor Bracket position if it is not proper.
Pass
Fail
3
Machine TEST
Machine TEST after Installation
(1) JUMP TEST
Pass
Fail
(2) WIPER TEST
Pass
Fail
(3) PICKER TEST
Pass
Fail
(4) TRIM TEST
Pass
Fail
(5) THREAD SENSING TEST
Pass
Fail
4
Check Needle Drop Position
M/C Type
Serial No.
Version Date
Installation
Technician
Country
Agent
Customer
Installation Date
Items to be Checked
Page 10 Of 11