background image

SB Flat Installation Manual

Contents

1.  Check installation tools 

2. Check Installation environment

3. Check and adjust levelness

4. Assembly

(1)  Checking Machine Exterior

(2) Assemble Spool Stand

5. Runing Test

6. Check and adjust needle drop position

7.  Check needle bar upper dead/needle drop point

8. Check and adjust rotary hook timing.

9.  Machine motion test and running test.

10. Embroidery test

SUNSTAR Co.Ltd

Page 1 Of 11

SWF CS Center

Содержание SB Flat

Страница 1: ...t levelness 4 Assembly 1 Checking Machine Exterior 2 Assemble Spool Stand 5 Runing Test 6 Check and adjust needle drop position 7 Check needle bar upper dead needle drop point 8 Check and adjust rotar...

Страница 2: ...hine to prevent direct light dust and humidity 4 Ground Condtion Foundation under the machine must be a sufficiently strong and flat concrete to support the weight of the machine 2 ELECTRICITY CONDITI...

Страница 3: ...k left right and front rear levelness Do not use leveling tool like table which is not a standard position Check the water horizontality carefully and if it is changed level it again Bolt At the point...

Страница 4: ...o the angle base Use M4L10 bolt to fix When using hose attach hose poiont A with tape At that time make a water in hose with beam stanard line then check water in hose in B and level M C If B is lower...

Страница 5: ...needle bar 2 Change needle bar to the needle bar no 1 and check gap 3 If there is a gap to front and rear of the head use M3 L wrench to set the gap to be within 0 1mm range minimum Picture 10 11 If t...

Страница 6: ...le Drop position is in front after removing Head Rail Gauge replace Head Rail to another one Head Rail Spec manufactured for E K Tubular 4 4 T 4 In case that needle drop position is in rear Insert Hea...

Страница 7: ...r and lock the needle bar holder bolt Try shaking JIG up down to check the looseness gap 4 Needle Upper Dead Point Setting 1 Fix the angle of main shaft at 0 Push down the needle bar push up the upper...

Страница 8: ...e point of rotary hook to the back of needle and space it with 0 1 0 3mm intervals 2 Rotary Hook Timing Setting Of the three fixing screws of rotary hook point at 135 degrees and at 75 degrees unlock...

Страница 9: ...Check the insertion amount and the position of picker 5 Upper thread holding motion test Check the upper thread holding device motion and how much holding device is opened 6 Thread cutting motor moti...

Страница 10: ...6 Input Voltage 1P V 2 Check machine installation and exterior conditions 1 Machine Installation Check Machien Levelness Pass Fail Adjust Machine Levelness by Leveling Bolt in case it is not correct...

Страница 11: ...Upper and Drop Point Drop Point 201 degree Upper Point 0 degree First After Adjustment Pass Fail Pass Fail 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 8 Embroidery TEST Run embroidery test using the fabric and th...