3
20220811 - L00009 (1.2) Swegon reserves the right to alter specifications.
Actionair
SPAN Installation Guide
Horioztonal Damper Installation
SPAN (access side above)
Actionair SmokeShield PTC - [AA/F 12368]
Installation Method
1. Bolt Unistrut (1.5mm minimum thickness) supports to
4 damper cleats and position damper in aperture with
minimum M10 bolts.
2.
Fix Unistrut supports to the floor with minimum ø6mm
fire rated fixings.
3. Shutter underneath with 50mm thick Shutterbatt.
IMPORTANT – to prevent any compound pouring into
the damper interface shroud and rendering the damper
inoperable the following MUST be followed: Do NOT
remove damper interface transit plate. Tape up under-
neath damper interface shroud. Do NOT fill above
damper casing
4.
Using thick consistency compound, trowel in the first
layer of approximately 25mm, all around the damper
casing, making sure all the gaps are fully sealed, as per
industry standard.
5.
When the first layer has set, pour in the next level to
100mm thickness. IMPORTANT;Compound must not
be too watery or runny as it risks penetrating into the
interface shroud. Do NOT fill above damper casing
6. When compound has fully set, remove damper inter-
face transit plate and check the internal is free from any
debris, remove any debris.
7. Follow the actuator installation procedure detailed in
this document.
Comments:
Rev:
Drawn By:
M. Bushell
Approved By:
Kimberley.M
1 of 2
Reference No:
Gore.S
Date:
Date:
By:
Date:
13/04/2022
03/04/2018
13/04/2022
Date:
B
Checked By:
Sheet
Rev
AAF12368
Description:
If your proposed installation details differ from
that shown here, please discuss this with the
authority having jurisdiction, referencing this
documentation.
Deviation from this drawing requires approval
of the relevant authority.
Connecting ductwork omitted for clarity.
Ductwork must be independently supported.
There must be an appropriate break-away
joint between the damper and the connecting
ductwork on both sides of the installation.
A minimum of 200mm between fire dampers
installed in separate ducts and 75mm between
fire damper and construction elements/edges
needs to be observed unless otherwise
specified in the drawing.
Installation Detail
Damper Size Range (mm)
HORIZONTAL APPLICATION
SMOKE COMPOUND
SEAL - SPAN, ACCESS SIDE
ABOVE
200 x 200 to 1000 x 1000
For detailed installation, please
view document ED-AA-4.
A
ECN1932
MJB 05-11-20
Tape up underneath the damper interface shroud
to protect against penetration of mortar into the
interface shroud. It is important that no mortar
enters the shroud.
© Swegon Air Management Limited
South Street, Whitstable, Kent CT5 3DU
Tel: +44 (0)1227 276100
Email: [email protected]
www.swegon.com/uk
Please refer to the DoP
for latest classifications
for CE/UKCA
compliance and the
Installation, Operation
and Maintenance Guide
SCAN ME
B
ECN2227
MJB 13/04/22