Commissioning

The procedure detailed under periodic maintenance 

should be followed

Periodic maintenance 

As detailed in BS 9999:2008
1. For dampers this is at least once per year for units 

with spring operation.
2. Units operating in dust laden atmospheres, should 

be checked more often to suit the severity of the 

conditions
3. Units associated with systems may be required to 

be checked, as part of the system, as often as once 

per week or month to ensure ongoing confidence 

in the life safety system. This may be seen as 

analogous to fire alarm systems.

Procedure

1. The units should be carefully inspected and 

cleaned of dust and debris
2. The units should then be lubricated with a light oil, 

by wiping this over all the surfaces
3. The mode should be operated to ensure that it 

is moving the blades from open to closed and the 

reverse.
4. If the end switches (in the mode) are being used, 

it should be checked that they are actually indicating 

that the blades are open or closed. This is done 

by running a cycle and checking both the blades 

(open and closed) and the indication that the micro 

switches are feeding back to.

LNNN00352 (3.1)

Содержание actionair FireShield

Страница 1: ...HEVAC frame 2 Mark up the lintel at the top of the hole in the wall to give positions that match to the building ties Drill into the lintel and fit stud anchors not supplied or similar steel fixings e g Loden anchors loop head min Ø6 5mm x 63mm 3 Turn out the building ties on the damper and place damper into position supporting from underneath with a block of wood or board which will need to be re...

Страница 2: ...ound the building ties and the stud anchors to hold the damper in position Note This will also maintain the quality of the link between the damper infill mortar and the floor slab should a fire occur 5 Shutter beneath the damper if required add mortar from the top of the slab infill to the HEVAC frame Do not to infill past the line on the interface shroud if the motor is to be fitted above the sla...

Страница 3: ...blems are foreseen 8 Using the access opening provided are the damper blades in the open position Check position of damper blades 9 Has the damper been checked for internal cleanliness free from damage and that vertical casings in particular are free from debris With the damper in the closed position inspect for damage 10 Has the damper been released to simulate operation of the thermal release Da...

Страница 4: ...required to be checked as part of the system as often as once per week or month to ensure ongoing confidence in the life safety system This may be seen as analogous to fire alarm systems Procedure 1 The units should be carefully inspected and cleaned of dust and debris 2 The units should then be lubricated with a light oil by wiping this over all the surfaces 3 The mode should be operated to ensur...