Horizontal in Floor Slab - 

HEVAC / HVCA Installation frame (IF)

Damper installation method
1. Measure the positions of the building ties on the 

HEVAC frame.
2. Mark up the inside edges of the hole in the slab to 

give positions that match to the building ties. Drill into 

the floor slab and fit stud anchors (or similar) - leaving 

them protruding into the opening.
3. Turn out the building ties on the damper and  

offer the damper into position.
4. Using steel wire (min Ø1.5mm not supplied) wrap 

Horizontal on Floor Slab HEVAC/HVCA 

Installation Frame (IF) 

Damper installation method
1. Connect duct work to damper spigot, using 

suitable breakaway joints or aluminium rivets.
2. Turn out the building ties on the damper.
3. Position the damper on the floor slab, centrally  

into the aperture.

this round the building ties and the stud anchors 

to hold the damper in position (Note: This will also 

maintain the quality of the link between the damper, 

infill mortar and the floor slab should a fire occur).
5. Shutter beneath the damper (if required) add 

mortar from the top of the slab infill to the HEVAC 

frame. Do not to infill past the line on the interface 

shroud if the motor is to be fitted above the slab.
6. When the mortar is firm remove the shuttering (if 

applied) and infill with more mortar to the HEVAC 

frame from below the slab. Take care not to infill  

past the line on the interface shroud if the motor is  

to be fitted below the slab.

4. Shutter out as required prior to casting the 

concrete plinth, making suitable precautions to 

protect the damper.
5. It is important to ensure when constructing the 

concrete plinth that the concrete is of a trowelling 

consistency, so it does not run into the installation 

frame gaps and the damper itself, rendering the 

damper inoperable.

Содержание actionair FireShield

Страница 1: ...HEVAC frame 2 Mark up the lintel at the top of the hole in the wall to give positions that match to the building ties Drill into the lintel and fit stud anchors not supplied or similar steel fixings e g Loden anchors loop head min Ø6 5mm x 63mm 3 Turn out the building ties on the damper and place damper into position supporting from underneath with a block of wood or board which will need to be re...

Страница 2: ...ound the building ties and the stud anchors to hold the damper in position Note This will also maintain the quality of the link between the damper infill mortar and the floor slab should a fire occur 5 Shutter beneath the damper if required add mortar from the top of the slab infill to the HEVAC frame Do not to infill past the line on the interface shroud if the motor is to be fitted above the sla...

Страница 3: ...blems are foreseen 8 Using the access opening provided are the damper blades in the open position Check position of damper blades 9 Has the damper been checked for internal cleanliness free from damage and that vertical casings in particular are free from debris With the damper in the closed position inspect for damage 10 Has the damper been released to simulate operation of the thermal release Da...

Страница 4: ...required to be checked as part of the system as often as once per week or month to ensure ongoing confidence in the life safety system This may be seen as analogous to fire alarm systems Procedure 1 The units should be carefully inspected and cleaned of dust and debris 2 The units should then be lubricated with a light oil by wiping this over all the surfaces 3 The mode should be operated to ensur...

Отзывы: