
SL-2418.MAI
4-10
04/2020
ADJUSTMENT
Should the jib lockout valve need adjustment the first step will be to loosen the mount bracket
screws (see illustration above). Reposition the jib lockout valve with respect to the valve ramp
by turning the adjustment screw on the valve mount bracket as follows:
Clockwise Adjustment
– Moves the jib lockout valve closer to the valve ramp
Counter-Clockwise Adjustment
– Moves the jib lockout valve away from the valve ramp
Once the valve has been moved back into proper adjustment, then tighten up the mount bracket
screws.
PART NUMBER & SPECIFICATION
SwapLoader
Pt. No.
Work Port Size
Spool Type
Pressure
(Maximum)
Flow Rate
(Maximum)
21P28
3/4-16 ORB (SAE 8)
2-Way, 2-Position N.C.
4,600 PSI (Nominal)
16 GPM (Nominal)
Please contact your SwapLoader Distributor or SwapLoader USA should you have any
questions regarding this procedure.
SIDE VIEW
Mainframe
(Ref)
Mainframe
(Ref)
Pivot Joint
(Ref)
Mount Bracket
Screw (2-Typ)
Valve Ramp
Valve Ramp
Jib Lockout
Valve
Valve
Mount Bracket
Screw (2-Typ)
Adjustment Screw
Valve Mount
Base
1/8" to 3/16" of
Roller Exposed
JIB LOCKOUT VALVE ADJUSTMENT ILLUSTRATION
TOP VIEW
Valve Mount
Bracket
Valve Mount
Bracket
Side
View
Side
View
Содержание SL-2418
Страница 1: ...Model SL 2418 Parts and Operations Manual Hoist Serial Number ____________________ ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 7: ...INTRODUCTION ...
Страница 8: ......
Страница 15: ...INTRODUCTION 1 7 09 2009 90P52 PROP DECAL OPTIONAL 90P78 HIGH PRESSURE FLUID ...
Страница 16: ......
Страница 17: ...INSTALLATION ...
Страница 18: ......
Страница 31: ...SL 2418 INS 2 13 04 2020 ...
Страница 41: ...SL 2418 INS 2 23 04 2020 ...
Страница 42: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 57: ...10 05 09 REAR LIGHT BAR ASSEMBLY 51H68 ...
Страница 60: ...10 05 09 ...
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ...OPERATION ...
Страница 66: ......
Страница 72: ......
Страница 73: ...MAINTENANCE ...
Страница 74: ......
Страница 76: ...SL 2418 MAI 4 2 04 2020 ...
Страница 90: ......
Страница 91: ...PARTS LIST ...
Страница 92: ......
Страница 94: ...50H72 REV E SL 2418 MAINFRAME SUB ASSEMBLY 3 7 6 2 8 9 10 11 13 10 9 8 3 6 13 11 7 8 18 19 17 ...
Страница 97: ...SAFETY LATCH ASSEMBLY SL 2418 50H76 REV C ...
Страница 99: ......
Страница 104: ......
Страница 105: ...OPTIONS ...
Страница 106: ......
Страница 107: ......
Страница 110: ...HOIST INSTALLATION KIT EHV SL 2418 52H86 ...
Страница 111: ...EHV TANK CIRCUIT SL 2418 91H30 REV A ...
Страница 112: ...EHV PUMP CIRCUIT 200 SERIES 91H31 ...
Страница 113: ...T M U S A LTD EHV VALVE HOSE CIRCUIT SL 2418 91H33 ...
Страница 114: ......
Страница 115: ......