3.1. Installation and Setup Check List
Check
Instrument’s specification must conform to the National Electrical
Code, all state and local codes, and all plant codes and standards
for electrical equipment.
On-site require
-
ments
100–240 VAC (
10%), 50/60 Hz (
5%) or 24 VDC (±10%),
isolated power outlet with ground connection and 30 VA.
Sample line with a flow rate of 5–20 l/h and a maximum pressure
of 10 bar.
NOTICE:
The maximum inlet pressure of 10 bar must never be
exceeded, not even for short time periods. Protect the
instrument from pressure surges in the sample line.
Waste line with pressure free drain.
Installation
Install the AMI Monitor, p. 15
Connect Sample and Waste, p. 16
.
Electrical Wiring
NOTICE:
Do not switch on the Instrument until all electrical
connections are made.
Connect all external devices like limit switches, current loops and
.
Power-up
, wait until the measuring chamber is
completely filled.
Switch on power.
Instrument
Setup
Program all parameters for external devices (interface, etc.).
Program all parameters for instrument operation (limits, alarms)
Run-in time
Let the instrument run at least for 2 hours, better overnight to rinse
out any pollution from transport and manufacturing.
Verification
Never perform a verification before the run-in time is over and
before the measuring value is stable.
A verification may be done to prove the instrument functions.